JW Marriott Anaheim Resort

                                                             JW Marriott Anaheim R
                                                             JW Marriott Anaheim Resortesort
                                                             LOCATION: Orange County, CA
                                                             OWNER: Prospera Hotels and O'Connell Hotels
                                                             GENERAL CONTRACTOR: W.E. O'Neil Construction
                                                             CURRENT CONTRACT VALUE: $19.5M

                                                             The team utilized Rosendin's design-build experience and
                                                             in-house BIM and engineering teams for the electrical design
                                                             as well as the LV, Security, and AV scope on the project.

                                                             Rosendin was responsible for the interior lighting design
                                                             and worked with the Owner and Interior Designer to virtually
                                                             engineer (VE) the entire fixture package and consolidate
                                                             fixture types while still providing the desired aesthetic.
                                                             Rosendin also coordinated, engineered, and installed
                                                             structural supports for the Owner Furnished Contractor
                                                             installed chandeliers throughout the amenity spaces with
                                                             fixture weights ranging from 60lbs-5,500lbs.

                                                             The LV, Security, and AV designs involved working hand
                                                             in hand with the Owner and Marriott to create a design
                                                             desirable to the JW brand while also protecting the Owner’s
                                                             budget. All of this was achieved along with sequencing the
                                                             work to allow the Owner to stock the building early and
                                                             deliver the project by the scheduled completion date. This
                                                             truly is a luxury property and an incredible way to bring the
                                                             JW Marriott brand to Orange County.


        Del Mar College South Campus Phase 1Aollege South Campus Phase 1A
        Del Mar C
        LOCATION: Corpus Christi, TX

        OWNER: Del Mar College
        GENERAL CONTRACTOR: Fulton Construction Company
        CURRENT CONTRACT VALUE: $1.3M

        The bulk of the first phase for the South Campus project involves site utilities, excavation, and the construction of a new
        central plant for a greenfield campus. Rosendin also won the $ 13.4M contract for the entire new campus project which
        includes a Main Building for Student Services, Campus Security and gathering areas; Library; STEM Building with an
 THRIVE
        Architecture Studio and Maker Space; and Culinary Academy with Teaching Kitchens and a Coffee Shop/Restaurant.
 DESPITE A GLOBAL PANDEMIC, ROSENDIN CONTINUES TO














 As many businesses across the country are forced to closer their doors
 during these unprecedented times, Rosendin continues to run and complete
 projects and win new work. The efforts from our teams across the United
 States has proven that another 100 years of shared success is not only a
 possibility, but well within reach. See some of those projects highlighted on
 the following pages.