Page 28 - Q2_2020_Newsletter
P. 28

Welch Hall Stage B

                                                                                                                                  LOCATION: Austin, TX
                                                                                                                                  OWNER: University of Texas
                                                                                                                                  GENERAL CONTRACTOR: The Beck Group

                                                                                                                                  CURRENT CONTRACT VALUE: $10.3M

                                                                                                                                  The bulk of this project consists of the renovation of raised
                                                                                                                                  floor chemistry labs, auditoriums, collaborative spaces and
                                                                                                                                  administrative spaces. The project also involves replacing a
                                                                                                                                  15KV Medium Voltage substation that feeds Welch Hall and
                                                                                                                                  the surrounding buildings on campus. The building is made
                                                                                                                                  up of three (3) separate structures that were built in 1929,
                                                                                                                                  1961, and 1978. The coordination and integration of all the
        Contra Costa County Administration Buildingontra Costa County Administration Building                                     buildings and systems is the largest challenge on the project.
        C
                                                                                                                                  Rosendin's scope includes electrical, telecommunications,
        LOCATION: Martinez, CA                                                                                                    and fire alarm.
        OWNER: Contra Costa County
                                                                                                                                  The project will support the engineering and chemistry
        GENERAL CONTRACTOR: Hensel Phelps                                                                                         students at the University of Texas and be the home to many

        CURRENT CONTRACT VALUE: $15.4M                                                                                            student groups and organizations.

        Rosendin was part of the team for the new Contra Costa County Emergency Operations Center. The two-story, 38,000
        square foot building includes a training lecture hall and serves as a planning and media center for the sheriff’s
        department. The building also provides breakout conference rooms, a situation room to monitor all emergencies in the
        area including COVID-19 issues, a fitness area, and office space to accommodate the sheriff’s operations. A major feature
        of its design is its ability to operate independently for up to a week if a natural disaster or crisis event occurs that
        dismantles the city’s utilities or requires an emergency assembly.





                                                                                                                                                                        V
                                                                                                                                                                        VA Outpatient ClinicA Outpatient Clinic

                                                             ABIA Consolidated                                                                                          LOCATION: Phoenix, AZ
                                                             Maintenance Facility                                                                                       OWNER: U.S. Federal Properties, Co.
                                                                                                                                                                        GENERAL CONTRACTOR: Jacobson Construction
                                                             LOCATION: Austin, TX                                                                                       CURRENT CONTRACT VALUE: $11.8M
                                                             OWNER: Austin-Bergstrom International Airport
                                                             GENERAL CONTRACTOR: J.E. Dunn                                                                              At 275,157 square feet, the new Phoenix facility will be one of the largest
                                                                                                                                                                        VA outpatient clinics in the U.S., with more than half a million visits per year
                                                             CURRENT CONTRACT VALUE: $5.9M                                                                              anticipated. The five-story clinic will include multi-specialty and telehealth
                                                                                                                                                                        clinics, an education center, pathology, and imaging. A full kitchen and canteen
                                                             Rosendin is helping to construct a new LEED Silver                                                         for staff and patients will be on the first floor. The second floor will house
                                                             consolidated maintenance facility on 16 acres northeast of                                                 one of the largest outpatient mental health clinics in the valley, providing
                                                             the Austin airport. The new facility will provide maintenance                                              counseling and specialty mental health services. Floors three, four, and five
                                                             support to the main airport daily operations and include                                                   will feature an innovative planning approach for the PACT module, which
                                                             maintenance headquarters, motorpool, warehouses, trades,                                                   will accommodate 72 PACT teams serving approximately 180 exam rooms.
                                                             recycling, truckwash, garages, several canopies and the                                                    The clinic design also emphasizes technology-based care including remote
                                                             Airport Police Department, as well as a De-Icing equipment                                                 diagnostics and telehealth to serve patients from their homes or other clinic
                                                             storage building.                                                                                          sites. Electronic self-check-in and mobile check-in are among the technology-
                                                                                                                                                                        centered amenities incorporated into the design. Rosendin's team is working
                                                                                                                                                                        on the special low voltage systems.





        28    The Feeder | Issue 2, 2020                                                                                                                                                                          Issue 2, 2020 | The Feeder    29
   23   24   25   26   27   28   29   30   31   32   33