Page 17 - Q3_2021_Corp Newsletter
P. 17

RESEARCH & DEVELOPMENT






                                          Improve Study Efficiency                                 Synthesize
                                               and Improve                                         & Theorize
                   HOW R&D                                           SCALE UP & STUDY
                                                                       EFFECTIVENESS
           DEVELOPMENT
 A TIME FOR   AND DEPLOYMENT


 RENEWAL &            WORKS                    Design, Develop      CYCLE OF RESEARCH
                                                                      & DEVELOPMENT
                                                  and Test                                       Explore, Hypothesize
                                                                                                      & Clarify
 THE MATRIXED

 R&D PROCESS  or IT. Once we move into the last three phases of   BIM team notes correctly that one of the biggest


         Design/Test/Deploy, we are often supported by, or       challenges is that scanning technology doesn't offer
 By Bill Mazzetti, Senior VP of   supporting others, in Field, Operations, BIM, or IT.   the registration and accuracy required to get the
 Research & Development  We are blessed to work with a host of experts internal   resulting data into a sufficiently accurate database.
                                                                 The Sheet Viewer catches a lot of this, but we are all
         and external to Rosendin. R&D's work lends itself to
                                                                 working on a more automated system that can be
         multi-tasking and parallel paths in larger workgroups
                                                                 used by multiple activities, like QA/QC, that works well
         to keep the wheels of progress moving quickly and
                                                                 with Field/BIM 360. The existing tech works, but it's
         accurately. For example, our solar robot prototype
                                                                 acutely expensive for the speed and accuracy and often
         is currently being assembled, allowing time for the
                                                                 doesn't work well enough without a mesh network on
         team to look at other work. In this case, that other
                                                                 site. We expect the technology to catch up to us and
         project is a new fixed-mount solar panel solution.
                                                                 our needs in 3-5 years, and we're watching it closely.
         In talking about rotation, I'm pivoting into automated
                                                                 That doesn't mean that machine scanning and locating
         quantity surveying while our R&D Analyst is shifting
                                                                 aren't useful. We're adapting an existing system from
 Some Say Spring is a Time for Renewal. For Research & Development (R&D), renewal   into a new fixed-mount panel system coupled with   our robotics partners to count installed panels, piers,
         a new hardware system for static-mounted solar
 comes in the fall. Similar to Operations, R&D is a project-based undertaking. We work   applications. This one is still panning out, and more   tracker arms, and other systems on these extensive solar
                                                                 sites for our utility-level solar work. This would include
 on projects until they are completed or transfer them to the sustaining organization(s)   details will come when it's a bit more formed.   scanning work areas daily with UAV/drone systems far

 within Rosendin. However, there comes a day when everything we do comes to an end,   Quantity surveying covers many aspects of our worksite   faster than we could in a truck. One benefit is that the
 and another team within Rosendin takes up the work and deploys it into the company.   conditions, installed quantities, and earned value. Much   UAVs can indicate flooding and other site conditions
         of this work will integrate existing data, like merging   that would not permit work in an area and can be
         and crunching the data from timecards, models, QA/      readily applied to any large underground site project.
         QC, BOMs, work plans, and packaging to give us a
                                                                 I want to close with the update on the solar panel robot.
         more accurate assessment of installations (accurate     While many have applied for Department of Energy
 necdotally, any R&D effort runs 12-36   One of the critical points to R&D success is the process.   viewed as +/- 1%). This assessment will tell us what's   grants, are working with manual panel placement, or
 months, depending on the head start we   More importantly, it's an applied process. One can't   installed, about to be installed, and left to do. The   haven't been funded, our robot is well into fabrication.
 apply the same tools, skills, and planning to a robotics
 A have on a project and the complexity of   benefits are better CACs, accurate labor projections,   The chassis construction is nearly complete, with the
 effort as hardware, VBS, or quantity surveying project.   far earlier reactions to problems or workarounds,
 work. For the solar robot, we had a "spirit animal"   Our creative cycle falls into six phases – Idea, Vetting,   validation of the projected vs. actuals in the cost   robot arm being delivered and tested, which means
 project to work from, but the entire project was   Plan, Design, Test, Deploy. The first three phases of   reports/project plans, and a much more precise earned   our prototype will start field testing in late Q1 2022.
 original work. For the Kit of Parts, where we have   the development process define what we intend to do   value of the installed work for projects that require   During Rosendin's annual Manager's Meeting,
 existing assemblies and families, the work consists   and our specific goals for the work. In these phases,   this. Honestly, we have the front-end wired. We need   our team will provide an update with photos and
 we do our critical analysis of Cost/Benefit and Go/  to get the back-end actuals to be as accurate.  installation videos. ■
 of cataloging and refreshing working ideas.
 No Go. Each initiative may be initiated anywhere
 in the company and led by R&D, Operations, BIM,   Sometimes when this info merger and processing
         isn't enough, we need to roll out the hardware. Our


 16  |  THE FEEDER                                                                                  THE FEEDER  |  17
   12   13   14   15   16   17   18   19   20   21   22