Page 22 - Q3_2021_Corp Newsletter
P. 22

LOCATION: Bend, OR                                                                                                                                                              FIVE FORKS SOLAR
       CLIENT: Oregon State University                          OSU CASCADES
       GENERAL CONTRACTOR: Swinerton Builders                                                                                       LOCATION: Macon, NC
       BUDGET: $4 Million                                       ACADEMIC BUILDING 2                                                 CLIENT: BayWa, Renewable Energy/HEMC, Halifax
                                                                                                                                    Electric, Membership Corporation
       Rosendin is providing electrical and data services for
       the construction of Academic Building 2 at Oregon                                                                             The Five Forks Solar project, located in
       State University’s Cascades Campus. The new building                                                                         Warren County, North Carolina, is a design-
       will provide a new learning environment for Science,                                                                         build 20 MWAC ground-mount solar                                                                               PROJECT PROFILES
       Technology, Engineering, Arts, and Math on the OSU                                                                           project. Located approximately 60 miles
       Cascades campus while creating a vibrant student                                                                             east of Raleigh, the project includes 75,000
       hub with active interior and exterior spaces. Its design                                                                     monocrystalline solar panels with ATI Trackers
       will elevate the University’s identity in Bend while                                                                         and SunGrow Inverters. The project time also
       exemplifying its commitment to sustainability with a                                                                         overcame challenging site conditions.
       Net Zero Energy target and a regionally sourced mass
       timber structure. As the first building to engage a 46-acre
       reclaimed pumice mine acquired by the University for
       future campus expansion, Academic Building 2 will perch
       atop its steep eastern rim with panoramic views across the
       future west campus and to the mountains beyond. The                                                                                                       BLACKWATER
       building and its adjacent outdoor spaces will step with
       the topography to create a gateway and link between                                                                                           COMMUNITY SCHOOL
       the existing upper campus and the future development
       in and around the bowl of the transformed mine.
                                                                                                                                                                                          LOCATION: Coolidge, AZ
                                                                                                                                                                                          CLIENT: Blackwater Community School
       PROJECT PROFILES                                                                                                                                                                   GENERAL CONTRACTOR: Gilbane Building Company
                                                                                                                                                                                          BUDGET: $3.5 Million (Electrical)

                                                                                                                                                                                          Construction on the new Blackwater Community
                                                                                                                                                                                          School, the Gila River Indian Community’s

                  75 HOWARD CONDOMINIUMS                                                                                                                                                  K-5 grade school located south of Phoenix,
                                                                                                                                                                                          was completed in August 2021. The 7.43-acre
                                                                                                                                                                                          campus was done by Rosendin, along with
                                                                                                                                                                                          Gilbane Building Company and design partner
                                                                    LOCATION: San Francisco, CA                                                                                           Breckenridge Group. The $31 million replacement
                                                                    CLIENT: 75 Howard LP                                                                                                  campus incorporates culturally significant
                                                                    GENERAL CONTRACTOR: Swinerton Builders                                                                                artwork throughout the two-story classroom
                                                                    BUDGET: $23 Million                                                                                                   building, media center, multi-purpose building,
                                                                                                                                                                                          and cafeteria. The community made a significant
                                                                    75 Howard is an exclusive LEED  Gold condominium
                                                                                                ®
                                                                                                                                                                                          investment in special systems to provide students
                                                                    tower located on the corner of Howard and
                                                                                                                                                                                          with the most modern and secure systems
                                                                    Steuart Streets in San Francisco, CA. As one of
                                                                                                                                                                                          available. These systems included fire alarm, Cat 6
                                                                    the last remaining sites on the waterfront in
                                                                                                                                                                                          cabling/fiber backbone (for internet, etc.), access
                                                                    downtown San Francisco, the 335,000-square-foot,
                                                                                                                                                                                          control/secured door systems, IP CCTV, security,
                                                                    220-foot-tall tower contains 120 residential units
                                                                                                                                                                                          IP overhead paging, and audiovisual. Rosendin’s
                                                                    on 20 floors above a 5,000-square-foot premier
                                                                                                                                                                                          team also worked on lighting, playground areas,
                                                                    restaurant space. Rosendin’s scope of work includes
                                                                                                                                                                                          basketball courts, sports fields, and reading patios.
                                                                    emergency power, fire alarm and security systems.
                                                                                                                                                                                          The campus also features an 83.16kW DC canopy-
                                                                                                                                                                                          mounted PV system.


       22  |  THE FEEDER
   17   18   19   20   21   22   23   24   25   26   27