ORANGE COUNTY
MUSEUM OF ART
LOCATION: Costa Mesa, CA
CLIENT: Orange County Museum of Art
GENERAL CONTRACTOR: S2N Technologies Group, LLC
BUDGET: $675K
Rosendin's Audio Visual group was the electrical
contractor for this AV project at the Orange County
Museum of Art. The AV system includes a 137-inch
video wall and a building-wide audio system with
multiple high-gain, wireless microphone systems.
Rosendin also developed a complete IP-based AV
network solution that utilizes a customer-developed
server platform for automation control.
PROJECT PROFILES
CSU FULLERTON
STUDENT HOUSING
LOCATION: Fullerton, CA
CLIENT: California State University, Fullerton
GENERAL CONTRACTOR: Sundt Construction, Inc.
BUDGET: $15M
The project included the construction of a new
185,505SF complex to accommodate 600 students
across three six-story buildings. Rosendin designed
the space to incorporate a student lounge, laundry
and Campus Police Sub-Station, administrative offices
for university staff, and a 3,700SF multipurpose room
to host events. Rosendin integrated technology
throughout the complex, including wall-to-wall wireless
access capabilities and over 2100 Category 6A cables
to allow network access throughout the facility.