                                           The construction                                 Under the premise of
                                       activities utilised 3.85                            ensuring function and
                                        mn cm3 of rock and                                  safety, the structural
                                      quarry material which                              design of structures were
                                         were sourced from                                 verified and optimized
                                         Geological Survey &                                through theories and
                                      Mines Bureau licensed                                   physical modeling,
                                        quarries in Colombo                              reducing 300,000 cm3 of
                                           & Gampaha and                               building stones, more than
                                       accounted for just 7%                              4,000 accropode blocks
                                       of the output of these                               and the project costs
                                                  quarries.









        The EIA was then amended in September 2013 to         The EIA also notes that disturbances to marine life
        reflect the increase in reclaimed land from 200       (due to dredging) will be temporary and there will
        Ha up to 269 Ha. Subsequently, a Supplementary        no loss of fishing grounds or coastal erosion.
        EIA (SEIA) was also conducted in 2015 by the
        Central Engineering Consultancy Bureau (CECB)         As per the due process, the EIAs were opened
        as the Lead Consultant, with a broader scope. This    for public consideration, which received over 215
        was carried out in two phases, the first to evaluate   written submissions and these comments were
        the impact of sand extraction, reclamation and        taken into consideration when granting the
        protective structures whilst the second evaluated     development permit to the Project Company,
        infrastructure development and construction as        which was subject to 72 conditions.
        per the Masterplan.
                                                              Furthermore, an environmental management
        The SEIA notes that the CCCC was regarded             plan (EMP) has been formulated and forms part
        as a competent land reclamation specialist            of the contract between the Project Company
        as it had undertaken several large land               and the GOSL. The EMP will be overseen by an
        reclamation projects around the world. As such,       environmental monitoring committee (EMC)
        environmental risks have been addressed during        which will ensure the project’s compliance
        the planning stages – an approach referred to         and adherence to the EMP. The EMC includes
        as “mitigation by design”. This has drastically       membership of various stakeholders such as the
        reduced the need for considering specific             CEA, NARA, Department of Fisheries, Department
        mitigation measures during the EIA process.           of Archaeology, as well as the EIA consultants and
                                                              the contractors.