        What were some of the challenges faced                As a result, we have successfully solved technical
        during construction?                                  problems such as sonar installation and imaging,
                                                              GPS positioning, and hydraulic-powered arm
        Due to the Indian Ocean monsoon, breakwater           installation, making it possible for the visible
        construction had to be during the non-monsoon         placement of accropode blocks and thereby
        period, which directly reduces the effective time     greatly improving the construction efficiency and
        available for construction. Coupled with the          engineering quality.
        narrow top of the breakwater and construction
        procedures, we would have failed to keep the          Similarly, various other mathematical modelling,
        construction project on schedule should we have       simulation exercises were conducted with the
        followed traditional construction techniques.         use of modern technology to overcome practical
                                                              challenges, optimize use of resources and ensure
        Information about the Indian Ocean monsoon            timely delivery of the project.
        was gathered to assist simulation analysis of
        the actual observations for the research into the
        main dynamic factors and patterns of sediment
        movement. Mathematical modeling based on the
        hydraulic structure and the progress of hydraulic
        reclamation was also conducted.

        With conclusions of these, we developed and
        optimized integrated plan for synchronized land
        formation and breakwater construction to guide
        on-site construction. Moreover, we verified the
        plan based on the actual situation and did a
        supplementary analysis.