EXPERIENCE



             Design Assist Experience





             Early Involvement promotes at team approach resul ng in on- me on-budget projects:
             ·  Involve  architects,  engineers,  general  contractor&  key  prime  sub-contractors  at  the
                 beginning of the design process to affect the cost and schedule.
             ·  Con nuous drawing and specifica on review between all par es to ensure the plan can
                 be designed and constructed with a predictable result.
             ·  Promote a collabora ve approach across all disciplines and levels of management.
             ·  Conduct  lessons  learned  sessions  throughout  the  life  of  the  project  (provide  data  for
                 con nuous process improvement.


             Design Assist Process promotes the following:
             ·  Detailed review, cri que, and commen ng of the design documents at each stage of the
                 document development.
             ·  Par cipate in the various design / preconstruc on mee ngs or conference calls.
             ·  Provide es ma ng services at each stage of the design document development.  Verify
                 the status of the budget at each stage and provide feedback / ideas to ensure the design
                 remains in budget.
             ·  Provide  adequate   me  /  manpower  for  on-site  review  of  exis ng  as-built  drawings.
                 Provide “boots on the ground” and be the “eyes” for the design engineers in an effort to
                 provide the most accurate and complete construc on documents possible.
             ·  Par cipate fully in the Building Informa on Modeling (BIM) process to produce, support
                 and/or  modify  the  appropriate  model(s)  as  it  pertains  to  your  scope(s)  of  work.    This
                 includes taking part in the development of the BIM Execu on Plan for this project.
             ·  Provide con nual input addressing constructability, availability of materials and qualified
                 trades  for  specialized  systems,  compara ve  cost/benefit  analysis  for  various  building
                 systems  and  budget/schedule  impact  as  specific  phases  of  the  overall  design  are
                 developed.                                                                                          Tri-City Electrical Contractors, Inc.

             HCA Trinity Phase 1 & 2        51,000 Square Feet         3.8 million
             Descrip0on of Work:
             ER Observa on beds. Ver cal Expansion of 5th and 6th floor & Fire Alarm


             Northwest Medical Center     102,000 Square Feet          9.5 million
             Descrip0on of Work:
                                                                                   rd
                                                                                      th
                                                                                          th
             New CEP replacing exis ng CEP services serving a ver cal expansion of 3 , 4 , 5  floors

             JFK Medical Center           102,000 Square Feet          8.5 million
             Description of Work:
             New CEP serving the renovation of existing 1  floor and new 3 story tower addition.