Page 23 - Peak Period Planning Document-ENGLISHV2
P. 23

1 WEEK PRIOR                                                                              THE DAY BEFORE

                 •  Create a zoning chart and make sure       •  Your  back room should have been          •  Make  sure best-sellers and key
                 that you have the right coverage for         cleaned and organized before the             items are pre-steamed, placed on a
                 the weekend. Factor in the need for          peak period.  Take time the week             rolling rack, and ready-to-go out.
                 a replenishment team each morning            before to ensure it is clutter-free and
                 (and possibly evening as well!) and          that the product is easy to access—          •  Stock and fill cash desk. Make sure
                 expect to have the steamer going all         you do not want your team to be              there are extra printer rolls, packaging,
                 day, each day.                               wasting time and energy!                     and bags. Have all POS details and
                                                                                                           coupon codes readily available.
                 •  Review the schedule to make sure          •  Make sure the team is well-informed
                 it is optimal — it is easier to cut back     of your plan of action. The team             •  Make sure to have change in your
                 than be caught short-staffed.                should be aware of:                          cash register.

                 •  Replenish gaps little by little each                                                   •  In StoreForce, create a break
                 day to ensure you never have to                                                           schedule and assign management
                 replenish the entire store at the last                                                    to oversee certain areas of the store
                 minute- create a system to slowly lift                                                    (ex: SM on the floor; ASM at the cash;
                 the replenishment in the store over                                                       TL at the fitting rooms). Make sure
                 3 days prior to the event. Lift piles                                                     to communicate the area attribution
                 (but ensure that you do not cover                                                         based on the StoreForce zone chart
                 any signage!) and add extra sizes into             TARGETS          PROMOTIONS            so the team knows who their GO-TO
                 walls and racks while respecting the                                                      person is during peak periods.
                 visual standards of the store.  Refer
                 to the Merchandise Replenishment                                                          •  Make a replenishment plan: assign
                 section of the Peak Period Planner.                                                       a replenishment team of 2 people to
                                                                    PRODUCT           DRESS CODE           be in charge of making replenishment
                 •  Make sure all the capacity guidelines         KNOWLEDGE                                throughout the store. Remember: the
                 are fulfilled.                                                                            more products we have on the floor,
                                                                                                           the more we will sell!
                 •  Inspect marketing elements and
                 prepare them for installation.
                                                                    ZONING           PROCEDURES

                                                                                                                                                      23
   18   19   20   21   22   23   24   25   26   27   28