Page 19 - INSTRUMENTED PILE LOAD TEST ON SOFT GROUND
P. 19

Pile Load Test Results





                     Pile Top Load (kN) versus Pile Top Settlement (mm)
                        for 4 Test Cycles of Maintained Load Testing
                                                                                                  1st  Cycle at 1 x WL (5186 kN), total settlement = 5.57 mm (< 12.5
                                                                                                  mm) and residual settlement 4.18 mm (< 6.5 mm)




                                                                                                  2nd  Cycle at 2 x WL (10425 kN), total settlement = 31.15 mm (< 38
                                                                                                  mm – 10% = 120 mm) and residual settlement 27.28 mm





                                                                                                  3rd  Cycle at 3 x WL (15496 kN), total settlement = 52.50 mm and
                                                                                                  residual settlement 45.82 mm




                                                                                                  4th  Cycle at 3.2 x WL (16836 kN), total settlement = 59.45 mm and
                                                                                                  residual settlement 52.26 mm