DESIGN AND CONSTRUCTION OF TERRALINK WALL AS LANDSLIDE
             REPAIR METHOD FOR THE ROAD BATANG KALI TO GENTING

       ABSTRAK


       Investigates a pivotal response to a catastrophic landslide incident in
       December  2022,  resulting  in  31  casualties.  The  proposed  remedy
       employs  the  TerraLink  technique  involve  soil  nailing,  polymeric
       reinforcement  strips,  steel  back-mesh,  prefabricated  welded  steel
       mesh     facing,   DrainTube     composite     drainage,    mechanical
       connections,  and  micropiles.  TerraLink  facilitates  the  creation  of
       Reinforced Earth walls in confined spaces between reinforced existing
       structures, forming a robust shored retaining wall system. The study
       delves into the advantages, stress tranfer mechanisms for Terralink
       systems,  showcasing  the  method's  adaptability  to  difficult  site
       conditions after landslides.


       The paper also emphasizing the integration with existing structures
       and  design  sequence,  incorporating  soil  reinforcements  and  steel
       modular    facing  systems.  The  chosen  treatment  proves  effective  in
       scenarios  where  conventional  Reinforced  soil  wall  and  gravity
       retaining  walls    face  limitations,  as  evidenced  by  its  successful
       application  in  widening  urban  platforms  and  constructing  walls  in
       steep topography.


       The  TerraLink  system  is  characterized  by  a  reduced  footprint,
       minimal traffic disruption during construction, rapid implementation,
       and economic benefits. The paper explores the system's adaptability
       to  various  environmental  and  technical  constraints,  making  it  a
       promising  alternative  for  sites  where  conventional  solutions  are
       impractical. With its sustainable and economical attributes, TerraLink
       emerges  as  a  transformative  method  for  landslide  repair  and
       infrastructure  development  in  challenging  terrains  and  constrained
       construction environments.