Page 70 - Design Considerations Based on Quantitative Risk Assessments for Slopes
P. 70

Case Studies




               Federal Route FT185




                ▪ Probability of reaching the element at risk, i.e., the vehicle, for each up-

                     slope  is  estimated  based  on  estimated  travel  distance  while  the

                     probability for down-slope is assumed as 1.0.





                                              95%                      5%
                                                                                         Travel distance estimates with their

                                                                                         confidence level for cut slopes based
                                          Cut or Up-Slope
                                                                                         on height and slope angle could be
              Slope Height                                                               interpolated to obtain an objective

                                                                                         estimate of probability of reaching the
                                                                                         element at risk, P
                                                                                                               TL
                      Slope Angle






                                                                                                     Fill or Down-Slope
                                                2m            6m           2m
   65   66   67   68   69   70   71   72   73   74   75