Page 70 - Design Considerations Based on Quantitative Risk Assessments for Slopes
P. 70
Case Studies
Federal Route FT185
▪ Probability of reaching the element at risk, i.e., the vehicle, for each up-
slope is estimated based on estimated travel distance while the
probability for down-slope is assumed as 1.0.
95% 5%
Travel distance estimates with their
confidence level for cut slopes based
Cut or Up-Slope
on height and slope angle could be
Slope Height interpolated to obtain an objective
estimate of probability of reaching the
element at risk, P
TL
Slope Angle
Fill or Down-Slope
2m 6m 2m