Page 7 - BULETIN GEOTEKNIK 2023
P. 7
Application of Silent Piling in JKR Projects
a
B
2
4
n
a
i
D
b
D
n
S
l
a
o
B
h
a
e
u
r
h
a
k
n
i
j
-
n
a
o
r
Projek Pembinaan Sekolah Baharu 42BD Dan Lain-Lain
L
P
i
e
a
n
a
m
L
k
e
P
M
B
K
a
M
a
h
o
t
k
i
k
u
,
t
S
a
h
a
n
e
K
Kemudahan Di SMK Bukit Mahkota,
d
u
m
D
i
n
g
n
a
g
n
a
r
a
L
o
B
Bangi, Hulu Langat, Selangor
u
,
S
u
a
l
t
H
,
i
l
e
g
Location Site boundary adjacent to SK Bukit Mahkota
Height of wall (exposed) 4.0m to 6.0m
Total height of wall 12.0m
Anchor type 12m length soil nail at 1.5m horizontal spacing
Length of wall 220m
JUSTIFICATION OF APPLICATION
Level difference at site boundary is 4.0m to 6.0m.
Horizontal space between site boundary and existing
school building is 1m.
Installation of wall shall not cause any damage to
adjacent school buildings.
Installation of wall shall not cause any disruption to
adjacent school’s operation.
Projek Tambahan Blok Baru Hospital Putrajaya (Reka dan Bina)
Location
Inside Hospital Putrajaya area
Height of wall (exposed)
Sheet Pile Wall
2.5m to 6.0m
Total height of wall
6.0m, 9.0m & 12.0m
Anchor type
18m length soil nail at 1.6m & 2.4m
horizontal spacing
Layout of Steel Sheet Pile Wall Length of wall
114m
JUSTIFICATION OF APPLICATION
1. To retain 5.0m high of site platform.
2. Limited space at site as there are
pile caps near the sheet pile.
3. Site constraint to do major
earthwork (cut & fill).
4. Installation of wall shall not cause
any damage to adjacent hospital
building.
Sheet piles installation using silent piling Cross Section of Steel Sheet Pile Wall
5