Performance Statistics:
Comparison of Consumption and SEC:
% % %
S. Connected change Consumption Change SEC Change
No FY Load (kW) w.r.t (kWh) w.r.t (kWh/kW) w.r.t
2019-20 2019-20 2019-20
1 2019-20 31,641 0 1,20,58,903 0 381 0
2 2020-21 33,277 5.17 97,52,241 -19.13 293 -23.09
3 2021-22 33,632 6.29 1,08,61,515 -9.92 322 -15.48
Even though consumption was increased about 11.37% for the period from April to
August during the FY 2021-22 compared with FY 2020-21 (Corona Pandemic period),
it was observed that 9.92% reduction in consumption and 15.48% reduction in
SEC during FY 2021-22 compared with FY 2019-20 for the same period from
April to August.
Energy Conservation Action Plan Targets by HQ for the year 2020-21
Target for Achieved
S.
No. Item Description the year upto
2021-22 Sep-21
1 Provision of sanctioned Lifts 4 1
2 Energy Consumption (w.r.t. last year) -5% -9.92%
100% implementation of Energy Audit recommendations
3 11 6
(No. of Audited Locations)
Bifurcation of fans in 2/3 circuits at stations to ensure
4 switching off fans in non-seated areas during non-train 10 7
hours
5 Provision of timers for Lighting & Fan circuits on Platforms 10 7
6 Reassessing the contractual demand (CD) at actual 2 1
Solar based street lights for a) Colonies b) Training
7 20 16
Institutes etc.
Natural light pipe system in select workshops and service
8 5 12
building
9 Energy Efficient pumps in place of old inefficient pumps 20 10
10 Automation of Pumps 10 6
11 Rewiring of Staff quarters 30 17
Use of occupancy sensors for light control in Officers
12 chambers, Conference rooms, Waiting Halls, concourse 25 16
area, SSE/JE's offices etc.
13 Provision of smart metering in residential quarters 200 786
Inverters AC's in place of non-star rated AC's excluding
14 100 30
EESL quantity
BLDC Ceiling fans in place of non-star rated ceiling fans
15 500 225
excluding EESL quantity