Page 123 - CompleteBooklet2021
P. 123

10. Performance:

                S.No  Parameter                     2020-21                  2021-22                   %
                                                           Perf               Prop              w.r.t
                                                          20-21     Target   Target    Perf    2020-     w.r.t
                                            Perf 20-21              21-22             21-22             Target
                                                           (Sep               (Sep)             21
                                                           20)                        (Sep)            2021-22
                1.           Asset Failure      18          2          52      26        8              69.23
                                                                                                 **
                2.           Punctuality         1          Nil       1.44      1        1                 -

                3.                                                   14.48  14.48  15.34  89.15          5.94
                        Outage                 8.87        8.11
                4.                  Alco       3.87        4.03        6        6      5.03  24.81      16.17

                5.            Ineffectiv DEM   7.06        6.46       11.8    11.8     7.99  23.68      32.29
                             e      U
                6.                  TCs        4.85        3.99       5.5      5.5     4.92  23.31      10.55

                7.                  Ferr      188.28       19.8       150      75     82.47              9.96
                                    ous                                                          **
                8.            Scrap   Non-    3.905         0          4       2.0     9.26              363
                                    Fe
                9.          Lube   to   fuel                                           0.46  67.71      23.33
                        ratio                  0.62        1.42       0.6      0.6
                10.        Maintenance  cost   1.03        1.15         -       -      0.54                -
                        (for 1000 HP)
                11.                                                  -25%  -25%                            -
                        IOD cases               Nil         Nil       YoY      YoY       1

                 11. INFRASTRUCTURE & FACILITIES:

                             Loco Maintenance  Pit lines with EOT Cranes – 8 Locos Capacity
                             Loco & DEMU Maintenance  Pit lines with EOT Cranes – 2 Locos Capacity
                             Loco  Under  truck  Maintenance  Pit  lines  with  EOT  Cranes  –  3  Locos
                           Capacity
                             Under Floor CNC Wheel Lathe
                             DM Water Plant of 3000 Ltrs/Hour  Capacity
                             Distilled Water Plant of 30 Ltrs/Hour  Capacity
                             Effluent  Treatment  Plant of 5000 Ltrs/Hour  Capacity
                             Incinerator  of 50 Kg/Hour Capacity
                             Oil Spectrometer
                             Computerized Water Load Box
                             RO plant  of 250 Ltrs Capacity
                             Loco/DEMU Turn  Table

                 12. IMPORTANT M&P:

                      Under floor CNC Wheel Lathe (BG)
                      Fork Lift Truck
                      Whiting Jacks
                      Road mobile cranes




                                                             120