  Other End Maintenance (OEM) at BDHN:

                              Train No.       From          To          Load         Frequency


                                57474          KCG-BDHN-KCG               10           Daily

                        Other End Maintenance (OEM) at MZL:

                               Train No.             From-To            Load     Frequency


                                 57503           MZL-BDHN Pass            3          Daily
                                 57448           MBNR-MZL  pass          10          Daily

                        Sick Lines in Coaching depots: 2

                       Work  for  relocation  of  IOH  shed  has  been  sanctioned  at  KCG  under  PH  4200
                       PWP 17-18. Work is under Execution,  TDC – 31.12.21.

               4.    Requirement of Coaches & Holding

                      Depot                               KCG

                      Bare requirement                    454
                      Total requirement                   496
                      Actual holding (incl. spares)       535

               5.    Infrastructure for Maintenance of Coaching Trains

                     Coaching trains: Status of maintenance facilities:

                                         Holding
                                 Pit                    Pit      Cat     HP
                      Depot             Capacity                               Drainage  M&P
                                line                  lights    walks    jet
                                          (ICF)
                                PL-2        24          A         A       A        A          A
                       KCG      PL-3        24          A         A       A        A          A
                                PL-4        24          A         A       A        A          A

                     Note:  A – Available, NA-Not available

               6.  Mechanized Laundry:

                      Maintenance  of departmental  laundry  of 2 Ton capacity per day.
                      As  the  capacity  of departmental laundry is not adequate, 2Ton/day linen washing
                       is also outsourced.
                      Presently,  laundry  is not functional  as there is no supply  of linen.