For other stations:

                    50  KG  capacity  Compost  Plan  procured  for  KRNT  and  NZB  stations,  under
                    commissioning.

                    Total  04  nos.  of  Vermicelli  Compost  Pits  are  provided  i.e.  at  BSX,  NZB,  KRNT
                    stations and nearby colonies and at Running  Room/ NZB.

                    The  manure  from  vermicelli  compost  is  taken  away  once  in six months and utilized
                    for the trees and plants at station, running  room and railway colonies.

               4.  PET Bottle Crushing Machines

                       PET  Bottle  Crushing  Machines  installed  16  nos.  at  the  following  stations  i.e.
                       KCG-08, NZB-01, BSX-1, KRNT-3,  FM-1, MJF-1, MXT-1

                       At KCG, PET bottles are collected from station, rag picking and the MCC & OEM
                       coaching  rake  maintenance  are  fed  into  bottle  crushing  machine.  The  crushed
                       recyclable  plastic  sold  to  the  agency  and  the  amount  deposited  at  Station
                       booking counter and figured as non-fare  revenue.

                       Same method is being followed at KRNT, NZB and BSX stations also.

               5.  Automatic Coach washing plant at KCG station

                       ACWP:  Automatic  Coach  washing  plant  at  KCG  station
                       Cost of the plant is 1.26 Cr. and AMOC cost for 5 years is
                       Rs. 98 lakhs. For one rake to be washed by using ACWP
                       1440  litres  of  fresh  water  and  5760  litres  of  recycled
                       water  is  being  used  whereas  on  manual  washing  3600
                       litres  of  fresh  water  is  being  used  saving  60%  of  water.
                       One operator per shift is required to operate the machine
                       and  one  entire  rake  is  getting  washed  in  duration  of  15
                       minutes.  The  rake  has  to  be  moved  at  a  speed  of  5  to  8  KMPH  for  effective
                       cleaning.  At Kacheguda depot 160 coaches will be washed every day

               6.  Energy  Neutral  system:  At  05  stations  i.e.  UMRI,  DAB,  KEK,  SVN  and  BLSA
                    stations are working purely  with solar energy.


               7.  CC cameras are installed to monitor the cleaning activities through  CC cameras.

                     Sl. No.                 Station                          CCTV Available
                        1           KCG                                           27 Nos.
                        2           NZB                                           12 Nos.
                        3           KRNT                                          25 nos.
                        4           BSX                                           08 Nos.