Page 156 - CompleteBooklet2021
P. 156

1.3 Running rooms/ rest rooms:

                       Following is the position of running  rooms in the division and their bed strength:

                       a.  Running  rooms:

                           Location          No.of Rooms             No.of Beds        Peak occupancy
                             NZB                   20                    60                40 (67%)
                             KCG                    3                    17               17 (100%)

                        b. Rest Rooms:

                           Location            No.of Rooms              No.of Beds      Peak occupancy
                            KRNT                     3                      15               6 (93%)
                             GWD        7 ROOMS & 12 Cubicles               26              7  (23%)
                            MBNR                     2                       7              4 (57 %)

                       The following  facilities provided in all Running  Rooms:

                            All running/Rest  rooms    NZB, KCG, MBNR, GWD & KRNT are provided
                              with Air conditioning.
                            At KRNT, KCG & GWD Rest rooms, Meditation room, Dining hall,  Kitchen.
                            RO purified drinking water with water coolers.
                            Hot water dispensers.
                            Washing machine, and Iron  Box and Ironing  pad provided.
                            Outsourced  in all respects including housekeeping.
                            Solar hot water system provided at NZB, KRNT & GWD.
                            Exclusive  Standby power supply  provided at GWD.
                            All running/rest  rooms NZB, KCG, MBNR, GWD & KRNT are provided
                              with CCTV and surveillance  system.
                            Digital bed occupation system was provided at NZB Running  room.

               2.0 Performance:

                2.1 Achievement of targets.
                                                        Apr-20 to Sep-20              Apr-21 to SEP-21
                          Parameter
                                                      Target         Actual         Target          Actual
               Diesel Loco Utilization                 571             399            430            403
               09 Hrs Compliance %                      85            68.7            85            61.4
               Punctuality  loss of trains in Dsl        0              0              0              2
               Loco Account
               Punctuality  loss of trains on
               Crew account                              0              0              0            0.167
               Stalling on account  of Dsl Loco          0              0              0              0
               Average Speed                            50             45            50.0            56

                                                            152
   151   152   153   154   155   156   157   158   159   160   161