Page 151 - CompleteBooklet2021
P. 151

7.  C&W Performance

                                                                   Propo-             Actual
                                                                   tionate
                                Performance Index                              (20-21)      (21-22)
                                                                   Target
                                                                  (21-22)     upto Sept  upto Sept
                    Ineffective  of AC coaches                       1           0.41        0.37
                    Ineffective  Non-AC coaches                     0.75         0.09        0.21
                    Enroute  coach      Territorial                  0.5          0            0
                    detachments         Ownership                    1            0            0
                    IOH                                              NA          138          196
                    Coaches marked sick within  100 days             NA           0            0
                    Punctuality         Direct                       1            7            3
                    Losses              In  Direct                   1.5          5            2


                  8.  End to End freight examination has been started at Nizamabad from 03.11.2020
                     with the existing facilities.

                 9.  „B‟ class ART is available at NZB.

                 10.  Area training centre available at KCG for training of Technicians  and Khalasis of
                     HYB and NED divisions.


                                                         EnHM


               1.  All  04  NGT  stations  of  HYB  division  i.e.  KCG,  KRNT,  NZB  and  BSX  stations
                    Environment  and  Housekeeping  Activity  monitored  by  EnHM  wing  from  Mechanical
                    branch.

               2.  Segregation  of  Bio-degradable  &  Bon-Biodegradable  Waste: The Segregation
                    of  Bio-degradable  &  Non-Biodegradable  Waste  is  being  done  on  daily  basis  and
                    same is handed over at nominated place of respective municipalities.

               3.  Wet  waste  to  Compost  methods  are  following  at  NGT
                    stations:

                    One  De-compost  machine  available  at  Kacheguda  station  is
                    maintained and supervised by EnHm wing.

                    At  KCG  Railway Station 01 no. De-composting machine installed and it
                    is  producing  100  to  120  kg  high  quality  organic  manure  per  week and
                    the  manure  is  being  supplied  to  various  units  for  the  use  of plants and
                    gardens  at  administrative  building,  office  bungalow  and  gardens  at
                    station  premises  which  is  an  effective  use  in  place  of  inorganic
                    fertilizers.

                                                            147
   146   147   148   149   150   151   152   153   154   155   156