Renovated CCTV room at Rail Nilayam
Redevelopment of Kurnool City Railway Station.
Kurnool City is one of the Important “A” (Now NSG-4) category station on HYB
Division. KRNT has been included in the list of 67 stations by Railway board which has to be
upgraded. The main emphasis with regard to upgradation is to bring visible improvement
without construction all over.
The following structural changes have been taken up so as to bring visible changes and
to address the present need but also cater to future anticipated traffic –
1. Then Existing RMS office, Electrical Sub-station, Parking sheds need to be relocated
on functional basis and area so obtained to be amalgamated to Exg. Circulating area
for addressing to bonafide passengers
2. The existing SCRMU, SCRES and ALRSC & ST organization offices need to be
relocated for providing parking sheds for different vehicular types.
3. The existing water tank need to be shifted so as make way for grand entry and to
decongest the entry to station.
4. The FOB alignment which is perpendicular to track is to be made parallel to track for
ease of use and to pave way for providing ample circulating area.
The cost of the Redevelopment of KRNT station work is Rs. 14.99 Crores including
4.20 Cr for relocation of SCRES, SCRMU, SCRSC & ST offices along with RMS,
Electrical substation, Over head water tank & parking with the following break up
Engg.& Commercial Cost = Rs. 11.57 Crores
Electrical Cost = Rs.1.35 Crores
S & T Cost = Rs. 1.97 Crores
Major works taken up are as under
The Elevated Overhead tank (Capacity 50,000 Ltrs) has been relocated
RMS office and Sub-station has been relocated
Shifted of SCRES, SCRMU, SCR SC & ST offices along with RMS, Electrical
substation has been completed.
Drainage system of entire station building area has been improved.
Work of provision of two lifts has been completed.
The façade of Old station building has been improved
Construction of New station building is completed
The entrance arch 15m wide both for entry and exit completed
Fabrication work for parking sheds completed
41