Page 42 - Company Profile Unit Bisnis - Kelompok 22
P. 42

TRAINING FOR CONCRETE
       QUALITY CONTROL SYSTEM



              The general public’s knowledge about concrete quality control, particularly in relation to cement, is relatively low. Many are not
       aware of the methods and equipment used to determine the required quality of cement in construction planning. In the testing of concrete
       quality control, several tools are commonly used to collect data, such as hammers, core drills, and Pundit devices, and the results are then
       analyzed. All of these processes require knowledge and practical experience that need to be learned and followed in concrete quality control,
       testing hardened concrete, and other related aspects.
              To address this issue, we, from the Civil Engineering Department at Politeknik Negeri Jakarta, are ready to assist in deepening
       knowledge about concrete technology. We offer support in learning the necessary knowledge and practices related to concrete quality
       control, testing hardened concrete, and other relevant aspects. Our department is dedicated to providing guidance and training to improve
       the understanding and skills of individuals in the field of concrete technology.



                  Training Purposes

         •   Performing proper quality control of                           Training Courses
                           cement concrete
         •   Participants are able to operate the                           •   Introduction of Testing Equipment
           equipment used for testing in the field                          •   Explanation on  Quality Control Testing
                                                                            •   Correction on Compressive Strength
                                                                            •   Hammer testing
                                                                            •   Continuation Testing  of Core Drill
                                                                            •   Testing of Crack depth
                                                                            •   Testing of Damage depth
                   Training Duration                                        •   Data analysis and post test

                                  2 Days




      39  COMPANY PROFILE
   37   38   39   40   41   42   43   44   45   46   47