Page 15 - Genex EN76 Installation Manual - Issue 05.03.2020
P. 15
Issue: 03/12/2019
● The loading of the racks may be done after inspection and hand over.
● In case of modifications of the rack system or discrepancies during the assembly experts
from the Constructor Group must be consulted.
● With corrosion promoting industrial floors (e.g. magnesite floors) isolation between all
components and the floor (especially the anchors) must be effected. Directions for use of the
flooring manufacturer are strictly to be observed.
4.2 Site Requirements
National regulations and standards for floor tolerances must always be considered.
● Information about lines, heating pipes, channels, maintenance shafts or something similar,
which are located in the hall floor need to be before the contract.
● The operator of the racking system must notify the manufacturer of the system about specifics
without being asked.
● Forces are transmitted into the floor via the baseplates. The suitability and capacity of the
hall floor must be ensured by the operator.
4.3 Tools & Clothing
● Screw-wrench
● Impact wrench
● Impact drill
● Tape measure
● Levelling device (for determining the height differences of the floor)
● Chalk line (for marking the frame position before installation)
● Safety gloves
● Safety helmet
● Safety footwear
● If necessary, locally related safety clothing and protective equipment for the protection
against falling
EN76 Pallet Rack System | 15