5 Inspection and Hand Over
The correct fitting of the components has to be checked
before the racks are loaded. The racks may be loaded
only after the end of installation.
An inspection should be carried out prior to obtaining
the clients authorized signature and ‘Acceptance
Certificate’.
Adjacent is an example of a typical “Acceptance Certificate” that should be obtained from the client
indicating his approval and acceptance that the installation has been successfully completed in
accordance with the contract specification and documentation.