                 5  Inspection and Hand Over




                                                         The correct fitting of the components has to be checked
                                                         before the racks are loaded. The racks may be loaded
                                                         only after the end of installation.

                                                         An inspection should be carried out prior to obtaining
                                                         the  clients  authorized  signature  and  ‘Acceptance
                                                         Certificate’.





















                 Adjacent is an example of a typical “Acceptance Certificate” that should be obtained from the client
                 indicating  his  approval  and  acceptance  that  the  installation  has  been  successfully  completed  in
                 accordance with the contract specification and documentation.