DIGGING UP







                    BRITAIN














































                   Unintentionally striking a pipeline can cause life-changing     whether it is for fencing, piling, or
                   injuries to contractors, therefore the industry has a duty      housebuilding, or industrial work,
                   of care to better protect those working on the frontline,       there is a real chance an asset may
                   as well as the general public. Richard Broome, Managing         be hit. Regardless of the asset type,
                                                                                   severe disruption, costly repairs and
                   Director at LinesearchbeforeUdig, shares what more can          reputational damage will follow, and
                   be done to keep the industry safe, drawing on data from         for the workers on site, there is the
                   its recent study into the excavation work currently taking      risk of injury and loss of life.
                   place in Great Britain                                          STRIKE FREQUENCY
                                                                                   While it is fair to assume that
                           he number of excavations   infrastructure at constant risk of   millions of potential underground
                           taking place across Great   being accidentally damaged, but also   strikes are avoided thanks to the
                           Britain is widely       put construction workers’ lives at risk.   intelligence provided by
                           acknowledged by the       In GB, there is more than 1.5 million  LinesearchbeforeUdig’s (LSBUD)
                   T industry to be more than      kilometres of underground       asset search facility, not all work
                   four million each year. In 2017, only   infrastructure already in situ. With   sites are searched in this way. It is a
                   2.25 million of these received a   the majority of digging work being   sad fact that there are entirely
                   thorough search for pipes and cables   carried out by contractors, normally   preventable strikes happening each
                   before the work commenced. This   on behalf of utility companies, it is   year, meaning we are seeing
                   means that 44 per cent of all the   easy to see why those involved are   avoidable injuries and fatalities, all
                   excavation that took place last year   at a heightened risk of striking pipes   because the decision makers have
                   did so without detailed examination   or other buried assets.   not spared the time to do a search
                   for existing underground assets. This   So, every time a spade or digger   before the digging begins.
                   not only put GB’s critical utility   bucket hits the ground, no matter   Our report gauged the scale of