corrosion is not that it occurs, but that   such as that achieved using polyethylene   have three time-dependent failure
                 its occurrence is very hard to predict.   (PE) materials, for example, are   modes. These are variously referred to
                 Many variables affecting what will   predictable. And they are predictable   as ductile rupture, stress crack rupture,
                 happen need to be measured on a   from knowledge of the polymer used, the   or oxidation breakdown.
                 job-by-job basis, which makes    transported fluid in the application, and   For ductile rupture, independent of
                 predicting failure in corroding pipes   the pressure regime used for a pipe   time, a very high internal pressure can
                 very difficult. And predicting failure is   network. With that knowledge, a   exceed the strength of the pipe causing
                 important when you are managing   well-constructed pipeline can have   it to stretch and fail in a ductile way.
                 critical long-term investments.  predictable performance measured in   With stress cracks, at lower pressures
                                                  hundreds of years.               but much longer timescales, the reliable
                 Predicting failure                 A science example can clearly   lifetime limit could be a brittle crack
                 The failure modes of a plastic pipe   illustrate the pipe classification system.   grown through the material. With
                 system, particularly a welded system   Polyethylene pipes (in our example)   oxidation, largely independent of