Corporation and State Forestry Departments.        fields relevant to the Wildlife Impact Study.
                                                                   The team shall be led and supervised by a
                       In assessing the species and habitat in     team leader who shall be responsible for
                a Wildlife Impact Study in Peninsular Malaysia,    coordinating the Wildlife Impact Study and
                the consultants must provide relevant              for ensuring the quality of  Wildlife  Impact
                information on regional and local endemism,        Study   Report    is  written   to   facilitate
                and wildlife conservation and protection           decision-making.

                status following the global IUCN red list, WCA
                2010, and Red List of Mammals for Peninsular              The Wildlife Impact Study Report must
                Malaysia (2017).                                   be submitted to the Director General of
                                                                   PERHILITAN within the stipulated periods for
                       Most studies on the terrestrial fauna in    approval. The  Wildlife Impact Study Report
                Peninsular Malaysia focused on the forests or      Review for the project under First and Second
                other   wildlife  habitats  (e.g.,  wetlands,      Schedule will be conducted  at  the  State
                marshes, coastal (including islands), mudflats,    PERHILITAN and PERHILITAN  Headquarters,
                etc.). The assessment of Biological Diversity in   respectively. After the Review Meeting, a
                such habitats may differ in altitude, substrate    letter of approval will be issued with a
                types and  climate. Identification of forest  or   statement  of Wildlife Management Plan
                wildlife  habitat  in proposed project  area       requirements.     Compliance      with    the
                should be carefully considered in a Wildlife       requirements in this Guidance Document will
                Impact Study because certain species may           fulfil the Project Proponent’s obligation to the
                not or can only be found in particular habitat.    Wildlife Conservation Act (WCA) 2010 (Act
                                                                   716). A general overview of the Wildlife
                1.5    GENERAL OVERVIEW OF                         Impact   Study    procedure    in  Peninsular
                       WILDLIFE IMPACT STUDY IN                    Malaysia is illustrated in Figure 1.2.
                       EIA PROCEDURES


                       The Wildlife Impact Study, is a part of
                EIA  study and must be conducted  by
                consultants  as  required by  Department  of
                Environment (DOE), under jurisdiction of
                PERHILITAN, at the pre-submission of EIA
                Report stage, particularly after the Term of
                Reference    Adequacy      Check    (TORAC)
                Meeting, as illustrated in Figure 1.1. A research
                permit is required before conducting a
                Wildlife Impact Study, after Term of Reference
                (TOR) has been verified by the DOE.  Wildlife
                Impact Study shall only be carried out  by a

                team of Qualified Persons who hold a valid
                registration with the DOE and endorsed   by
                PERHILTAN as Wildlife Qualified Person (see
                Chapter 3). The Wildlife Impact Study team
                shall comprise competent  and experienced
                professionals      in      the      technical

          4  GUIDANCE DOCUMENT ON  WILDLIFE
             IMPACT STUDY FOR IN ENVIRONMENTAL
             IMPACT ASSESSMENT (EIA)
   3   4   5   6   7   8   9   10   11   12   13