Page 110 - booklet draft
P. 110

c) Safety Meetings


                     Interaction  with  running  staff  through
                     safety  meetings  (6 nos  Avg.  per

                     Month)  have  been  conducted  to
                     counsel the running staff about recent
                     unusual  incidents  and  steps  to  be
                     taken to avoid such incidents.






             3. ACHIEVEMENTS (HIGHLIGHTS) OF TRSO

                3.1 REDUCTION OF REVENUE EXPENDITURE:

                    42.5    million units of electrical energy was saved by shutting down
                    locos, switching off blowers, coasting & Regeneration and 1341.4

                    KL of HSD Oil was saved by shutting down of Diesel locos resulting
                    in to a saving of Rs. 45.78 Cr.
                    Crew lobby outsourcing activities is carried out departmentally at
                    RDM,  BPA,  BDCR,  DKJ,  PRPI,  MUGR  and  MTMI  which  results  in  a
                    savings of 0.38 Cr.


                3.2 IMPROVEMENTS IN RUNNING ROOM/CREW LOBBIES :


                   Bavanapalem Rest Room for Crew:

                   Rest  room  with  six  beds  opened  at
                   bavanapalem station to meet loading
                   requirement          at     newly        opened
                   sattupali              station             (JVRB)
                   Jalagam Vengala  Rao  Open  Cast

                   Mines of Singareni Collieries Co Ltd
   105   106   107   108   109   110   111   112   113   114   115