Page 113 - booklet draft
P. 113
4. SYSTEM IMPROVEMENTS
12 Trains were converted from Diesel to Traction for which crew
was arranged without any detention to the Train
Review of Crew links:-
KZJ and GALA based crew links are reviewed duly considering
through run between BZA-BPQ-BZA. As a result of this, Crew
changing at WL station is avoided.
4.1PROMOTIONS:
LP(Passenger to LP(Mail /Express):-
107 no’s Loco Pilot passengers were promoted as Loco Pilot
Mail/Express and posted at various depots of SC Division.
LP(Goods) to LP(Passenger):-
60 no’s Loco Pilot Goods were promoted as Loco Pilot Passenger
and posted at various depots of SC Division.
Sr.ALP to LP(Goods):-
174 nos Sr.ALP’s were promoted as Adhoc Loco Pilot (Goods)
and posted at Various depots of SC Division.
4.2 TRAININGS (Undergoing Present):
137 No’s of Sr.ALP’s are undergoing Loco Pilot (Goods) training at
ETTC /BZA,DTTC/GTL &ZRTI.
4.3 RELIABILITY / SAFETY:
CUG Switch ON/OFF Status:-
Random checking of Loco Pilot’s Closed User Group (CUG) /
Personal mobile phone status while on duty and Surprise mobile
check at en-route stations at an average of 2350per month has
reduced the menace of keeping the mobile ON.