Page 113 - booklet draft
P. 113

4. SYSTEM IMPROVEMENTS


                     12  Trains  were  converted  from  Diesel  to  Traction  for  which  crew
                      was arranged without any detention to the Train


                      Review of Crew links:-


                     KZJ  and  GALA  based  crew links  are  reviewed duly  considering

                      through  run  between  BZA-BPQ-BZA.  As  a  result  of  this, Crew
                      changing at WL station is avoided.


                4.1PROMOTIONS:


                       LP(Passenger to LP(Mail /Express):-


                       107 no’s  Loco  Pilot  passengers  were promoted  as  Loco  Pilot
                       Mail/Express and posted at various depots of SC Division.


                       LP(Goods) to LP(Passenger):-


                       60 no’s Loco Pilot Goods were promoted as Loco Pilot Passenger
                       and posted at various depots of SC Division.


                Sr.ALP to LP(Goods):-



                       174   nos Sr.ALP’s were promoted as Adhoc Loco Pilot  (Goods)
                       and posted at Various depots of SC Division.


                4.2 TRAININGS (Undergoing Present):

                    137 No’s of Sr.ALP’s are undergoing Loco Pilot (Goods) training at
                    ETTC /BZA,DTTC/GTL &ZRTI.

                4.3 RELIABILITY / SAFETY:


                CUG Switch ON/OFF Status:-
                    Random  checking  of  Loco  Pilot’s  Closed  User  Group  (CUG)  /
                    Personal  mobile  phone  status  while  on  duty  and  Surprise  mobile
                    check  at  en-route  stations  at  an  average  of  2350per  month  has
                    reduced the menace of keeping the mobile ON.
   108   109   110   111   112   113   114   115   116   117   118