Page 114 - booklet draft
P. 114

Ambush Checks:-

                    Ambush checks with speed guns done at an average of 520 per
                    month  by  TRSO  officers  and  supervisors.  This  has  alerted  crew  to

                    maintain speed at CD spots/Loop lines.

                Speedo meter and VCD analysis:-

                    Speedometer  monitoring  data  downloading  and  analysis  at  an
                    average of 183 per month at all lobbies is being done.


                    SPM  analysis  and  VCD  data  analysis  vis-à-vis  CTR  timings  and
                    counselling the Running staff to run at maximum permissible speed
                    and also cross checking the safety parameters.


                CCTV Monitoring at various locations:-


                    To monitor the situations and activities over Crew Booking Lobbies,
                    Crew  Running  Rooms,  Trip  Sheds  and  Railway  Consumer  Depots,
                    Surveillance  CCTVs  with  visual  record  facility  are  installed  and
                    maintained.



                CVVRS Analysis:-


                    Crew  video  and  voice  recording  system  footage  data  is  being
                    downloaded from the locomotives and analysis is being done.At an
                    average 85 no of CVVRS videos per month data downloaded.
                4.4 WORKS UNDER TRSO:


                LIST OF SANCTIONED WORKS
                                                                         Allocation
                  S     Plan                                             Proposed
                No     Head            Description of work                   Cost                  Status
                                                                         (Rs.000’s)

                                  Replacement of over
                1      Const      aged / dilapidated                                           90% of work
                       Funds      Running room at MUGR.                27960                   completed.



                                  Augmentation/                                           In  ground  floor  2
                        6400                                                RRSK
                        OSW       improvement of Running                    20000         rooms                are
                2                 room capacity at                                        completed           and
   109   110   111   112   113   114   115   116   117   118   119