Page 159 - booklet draft
P. 159
13. ELECTRIC LOCO SHED/KAZIPET
1. SYSTEM IMPROVEMENTS
For improvement of Greenery area inside the shed premises,
around 2400 sq feet area is converted into Garden.
50 Smart energy meters provided in shed to measure energy
consumption on line.
Modification of Pressure Reducing Valve (PRV) in VCB.
Provision of in Built pressure gauge to check & trouble shoot in the
cases of DJ feedback fail/VCB stuck off/VCB Stuck on and during
schedule maintenance.
First ELS in SCRly devoloped Power module test kit for Medha
Traction Converter in-house to test the all sub equipment of power
module.
In house development of Racks to utilize vertical space inside
section rooms and proper material stocking.
Abro dynamic
balancing machine & TFP oil filtration plant of Nach make)
No staff are overdue for Refresher course(SSE:15, Tech:21)
Imparting of training to diesel shed staff to improve the maintenance
activities in WAG7 during 2022-23 is 70 staff
Existing 21 Conventional Relay based WAG7 locos are
Converted into Micro processer Based control system of V3
version.
12 conventional locos are provided with DPWCS system of
M/s.LWT make
As per the instructions from RB, Addl seat for CLIs and other inspecting
officials has been provided in 2 locos on trial basis(WAG9-1,WG7-1)
CIVIL DEFENCE: Civil defence Training has been organised from 19.09.22
to 24.09.22 at ELS/KZJ to create the awareness among the staff of EKZJ