Page 159 - booklet draft
P. 159

13. ELECTRIC LOCO SHED/KAZIPET


      1.  SYSTEM IMPROVEMENTS

                  For  improvement  of  Greenery  area  inside  the  shed  premises,
                   around 2400 sq feet area is converted into Garden.


                  50           Smart  energy  meters  provided  in  shed  to  measure  energy
                   consumption on line.

                  Modification of Pressure Reducing Valve (PRV) in VCB.


                  Provision of in Built pressure gauge to check & trouble shoot in the
                   cases of DJ feedback fail/VCB stuck off/VCB Stuck on and during
                   schedule maintenance.

                  First  ELS  in  SCRly  devoloped    Power  module  test  kit  for  Medha
                   Traction Converter in-house to test the all sub equipment of power

                   module.

                  In  house  development  of  Racks  to  utilize  vertical  space  inside
                   section rooms and proper material stocking.


                                                                                             Abro dynamic
                   balancing machine &  TFP oil filtration plant of Nach make)


                  No staff are overdue for Refresher  course(SSE:15, Tech:21)


                  Imparting of training to diesel shed staff  to improve the maintenance
                   activities in WAG7 during 2022-23 is 70  staff


                  Existing  21  Conventional  Relay  based  WAG7  locos  are
                   Converted  into  Micro  processer  Based  control  system  of  V3
                   version.
                  12  conventional  locos    are    provided  with  DPWCS  system  of

                   M/s.LWT make

                  As per the instructions from RB, Addl seat for CLIs and other inspecting
                   officials has been provided in 2 locos on trial basis(WAG9-1,WG7-1)
                  CIVIL DEFENCE: Civil defence Training has been organised from 19.09.22
                   to 24.09.22 at ELS/KZJ to create the awareness among the staff  of EKZJ
   154   155   156   157   158   159   160   161   162   163   164