8. Improving the Clear standing room (one line):
               At Gangadhara (GDRA) station, Loop line starter (S5) has been shifted duly shifting
               the  GJ  to  improve  the  CSR  from  686  m.  to  745  metersto  improve  the  traffic
               facilities.


            9. Replacement of aged / defective Point machines:
               82 no.  of  aged  /  defective  point  machines  against  115  no’sduehave  been
               replaced to improve safety and reliability.


           10.Replacement of Block Instruments:
               18 No.  of  Block Instrumentshave  been  replaced which  are  due for  POH  to
               improve the safety.

















           11.Directed Maintenance:

               At30 stations/ Locations, Directed maintenance has been carried out to improve
               the signal gear maintenance.


           12.Defective cable replacement:

               43.23Km  Defective  cable has  been  replaced  to  improve  signaling  system
               reliability.


           13.Replacement of aged/defective Secondary cells:

               3523 nos. of different capacities aged  secondary cells  have been replaced  to
               improve reliability.


           14.Cable meggering:

               At106Locations/stations cable  meggering  has  been  done against  165  no’s  to
               improve the safety & reliability.


           15.Replacement of Point machine Ground connections:
               223 No.  of  Corroded  Point  Ground  connections replaced  with  new  to  improve
               safety and reliability.

           16.Replacement of aged Relays:

               About829 no. of aged / defective relays (329 No. of aged Track Relays& 500 no.
               of Line relays) are replaced with new to improve the safety & reliability.