2. Interlocking        and      Commissioning            of    three      new       way      side
               stations:Sarvaram (SAVR),  Chandragondu (CDRG) and  Parthasarathipuram

               (PSHP)have  been  commissioned in  connection  with  Badrachalam  Road  –
               Sattupalli  section new  BG  Goods  line  with  25  KV  Railway  Electrification  on
               28.05.2022  by  Construction                                     /BZA organization.

















            3. Replacement           of    existing      Panel       interlocking       with     Electronic

               Interlocking:
               At 02 stations the existing Panel interlocking has been replaced to modified RDSO
               Ver  2.0  circuits  EI  in  view  of  Siding  works  duly  replacing  the  Indoor  &  Outdoor

               signalling assets to improve efficiency & throughput enhancement.
               a. Chittapur (CT) - 14.08.2022 (EI-Distributed)
               b. Sulehalli (SUH) - 06.09.2022 (EI-Centralized)
















            4. Provision of redundant BPAC at  02 Block sections :

               AtPeddampet (PPZ) – Ramagundam (RDM) section(Non-
               IB  section,  Tripple  line)  &Chittapu  (CT)- Sulehalli  (SUH)
               section (Double  line  – Non-IB)  HASSDAC has  been
               provided and commissionedin place of single DAC with
               diverse  power  supply  and  media  diversity  (OFC  &  6
               Quad) to improve reliability.