P. 85
Staff from other depots were also mobilized for early restoration.
The details of restoration measures taken after damages caused
during the agitation are furnished below.
Asset name quantity
BLDC fans 226 Nos
Water coolers 02 Nos
Pre paid meters 17 Nos
Escalator 2
Rolling in examination lights 18 Nos
2. HIGHLIGHTS (AC & TL)
F) Power car Energy
Management System:
Division had introduced a
Google drive sheet to monitor
the HSD oil consumption and
Energy (kWh) consumption
record of HOG trains.