Page 198 - Arch binder
P. 198
Operable Partitions
KWP-FOLD - TRIMMED PART 3 - EXECUTION
10 22 26 (10650)
3.01 INSPECTION 3.03 ADJUSTING AND CLEANING
A. Proper and complete preparation of the moveable glass wall A. The moveable glass wall panels and track system shall be
system opening shall be by others in accordance with the adjusted and cleaned in accordance with KWIK-WALL’s
architectural drawings, KWIK-WALL’s shop drawings and written instructions.
ASTM E 557. Any deviation of the actual opening from these
specifi cations shall be called to the attention of the architect 3.04 PROTECTION
prior to the installation of the operable wall.
A. The moveable glass wall panels shall be stored in the
B. Defi ciencies in the moveable glass wall opening shall be corrected stacked (retracted) position prior to acceptance by the
by others prior to installation of the moveable glass wall system. owner’s representative.
3.02 INSTALLATION 3.05 DEMONSTRATION
A. The moveable glass wall system shall be installed by A. KWIK-WALL’s authorized distributor shall demonstrate
KWIK-WALL’s authorized distributor. proper operation and explain proper and necessary
B. The moveable glass wall shall be installed in accordance with maintenance requirements of the moveable glass wall
KWIK-ALL’s written instructions, shop drawings and system to the owner’s representative.
ASTM E 557 installation guidelines.
KWP-Fold PRODUCT SELECTION GUIDE
Stack Perimeter Final Closure Maximum Maximum
Model Operation Arrangements Glass Trim and Options Panel Height Wall Width
Seals
Standard:
Standard: Standard: **Standard:
Center Stacked Clear Trimless Fixed Pivot
KWP-Fold Paired Optional: Panel *10' - 0" Unlimited
Panels Etched, Smoked, (3.05 m)
Decorated,
Patterned or
Berman
editions
**Pivot Panel may not be required. Consult your KWIK-WALL representative for proper confi guration.
5
Dimensions in [ ] are millimeters. Contact your local distributor for additional assistance or visit www.kwik-wall.com 05-16