Page 7 - aruba-today-20220204
P. 7

A7
                                                                                         WORLD NEWS Friday 4 February 2022
             U.S. to modernize, speed up work on Puerto Rico power grid



            By DÁNICA COTO                                                                                                      The deal also marks the
            Associated Press                                                                                                    launch of a two-year study
            SAN JUAN, Puerto Rico (AP)                                                                                          funded by the U.S. Federal
            — Three  federal agencies                                                                                           Emergency Management
            promised Wednesday to                                                                                               Agency that will  include
            help modernize Puerto  Ri-                                                                                          public participation to help
            co's outage-plagued pow-                                                                                            determine the best way for
            er grid and speed up efforts                                                                                        Puerto  Rico to reach 40%
            to strengthen  it  more than                                                                                        renewable energy by 2025
            four years  after Hurricane                                                                                         and 100% renewable ener-
            Maria razed it.                                                                                                     gy by 2050, a priority of the
            More than $12  billion  in                                                                                          administration of U.S. Presi-
            federal recovery funds are                                                                                          dent Joe Biden.
            available, and a portion of                                                                                         Kunkel praised those  ef-
            that will  help finance doz-                                                                                        forts, adding that her or-
            ens of  grid modernization                                                                                          ganization commissioned
            projects scheduled to start                                                                                         a study that found  Puerto
            this year, said  the U.S. De-                                                                                       Rico can realistically reach
            partment  of Housing and                                                                                            75% renewable energy  by
            Urban Development, which                                                                                            2035.
            signed the agreement with                                                                                           "It's absolutely feasible," she
            Puerto Rico's  government                                                                                           said  in a phone interview.
            along with the U.S. depart-  Puerto Rico Electric Power Authority workers repair distribution lines damaged by Hurricane Maria   "It's a question of politics."
            ments of Homeland  Secu-     in the Cantera community of San Juan, Puerto Rico, Oct. 19, 2017.                      She noted Puerto Rico's
            rity and Energy.                                                                                   Associated Press  outdated generation sys-
            In addition, more than $1.9                                                                                         tem is  97%  based on fossil
            billion  will  be used to im-  lights and the creation of  Atlantic hurricane season  dence  on petroleum, with  fuels.
            prove the island's  power  an early warning system for  starts.                        the island's power compa-    The deal also  calls  for the
            system, including the  cre-  dams.                        "It's very much needed,"  ny slated to sign contracts  U.S. Energy Department
            ation of  small and large  The announcement comes  said  Cathy Kunkel, ener-           for  at least 2 gigawatts of  and one of its laboratories
            microgrids with the aim to  as Puerto  Rico's Electric  gy  program manager for  renewable energy and 1  to develop a tool ahead
            help lower income house-     Power Authority  struggles  CAMBIO, a Puerto  Rico-       gigawatt of energy stor-     of the  June  1 start of the
            holds.                       to emerge from bankrupt-     based environmental orga-    age projects. Officials  said  hurricane  season  com-
            Officials said more than 130  cy  and  restructure some  nization. "The electrical sys-  Puerto Rico is finalizing ne-  bining models of  Puerto
            projects soon will be in the  $9 billion in debt as power  tem is still  very fragile and  gotiations on several  initial  Rico's electric system and
            bidding  phase or under  outages continue to hit the  there are a lot of problems  projects, including one that  hurricane forecasting to
            construction, including  re-  U.S. territory  of 3.2 million  with blackouts."         would provide 844 mega-      help the island prepare for
            pairs to substations across  people,  with many wor-      The agreement signed with  watts of renewable energy  storms and speed up emer-
            Puerto Rico, the replace-    ried about the state of the  the U.S. territory also aims to  and 220 megawatts of en-  gency response, officials
            ment of thousands of street  grid four months before the  lessen Puerto Rico's depen-  ergy storage.                said.q

            Mexico plans state lithium company, questions Chinese mine



            MEXICO CITY (AP) — Mexi-     private lithium mine  in the  already granted in Mexico
            co's president said Wednes-  northern  state of Sonora  would be respected as
            day he will create a state-  that involves  a Chinese  long as  they were well  on
            owned company  to mine  company would not be al-          the way  to producing the
            lithium and appeared to  lowed to start production.       metal. López Hernández
            suggest he will seek to can-  "What they want to do is to  said  at the time  that only
            cel one of the few existing  continue looting and that is  one  private mining com-
            permits held by a Chinese  over. We are going to take  pany  met those criteria.
            company.                     legal steps," López Obrador  Though he didn't name the
            President Andrés Manuel  said.                            mine, he apparently  re-
            López Obrador had said in  Asked specifically  if that  ferred to Bacanora Lithium,
            October  that he wants to  meant the mine would be  a project hoping to pro-
            declare lithium a "strategic  blocked from operating,  duce 35,000 tons of lithium
            mineral" and reserve future  López Obrador said,  "Lithi-  annually starting in 2023.
            exploration  and mining to  um is going to be mined by  López Obrador suggested
            the government.  Lithium is  the government."             the concession was illegally   Mexican President Andres Manuel Lopez Obrador gives his dai-
                                                                                                   ly, morning news conference at the presidential palace, Palacio
            a key component  of bat-     That operation, Bacanora  granted by a previous ad-       Nacional, in Mexico City, Dec. 18, 2020.
            teries.                      Lithium,  is Mexico's only vi-  ministration, saying that                                          Associated Press
            It hadn't been clear if  he  able  private lithium mine,  "this warrants an investiga-
            would rely on private com-   and had been  expected  tion into who gave these  change Mexico's constitu-            much of the framework of
            panies  to do the work,  to start production in 2023.  permits, this authorization."   tion to strengthen govern-   private  sector openings in
            which Mexico has no expe-    It is currently owned by Chi-  The declaration of lithium  ment control over electric-  Mexico's electrical power
            rience in.  But  López Obra-  nese lithium giant Ganfeng  as a "strategic mineral" re-  ity production and distribu-  market, giving the state-
            dor said Wednesday that a  International.                 served for the state must still  tion. It requires a two-thirds  owned  utility a guarantee
            newly created government  In  October, Interior Secre-    be adopted. The change is  majority in both  houses of  majority market share and
            company will do the min-     tary Adán López Hernán-      contained in legislation that  Congress and a majority of  allowing it to buy power
            ing and processing.          dez had said the eight con-  López Obrador has sent to  state legislatures.            from  private plants if it so
            The president also said  a  cessions for  mining lithium  Congress that also  would  The bill  would  eliminate  chooses. q
   2   3   4   5   6   7   8   9   10   11   12