Page 14 - SWI Work Instruction
P. 14

 Lendlease Services
PCT-TM-601A - Safe Work Instruction
     Safe Work Instructions
      Lone/ Isolated Working for Pole Inspection
     PREPARED BY:
    D Chesters,
     REV No: REV date:
   3 25/5/2020
   Document Number
      31
    Scope:
The following instruction must be followed when working alone or isolated for the purpose of Pole Inspection
      Action Instructions
     Safety issues:
   Always wear PPE and required safety gear.
     Safety issues:
      Ensure that suitable communications are in place when working alone.
     Remember these important key points must be followed
     1
      Staffing Resources
     Trained and competent personnel
            2
      Required Training and Certificates
   Relevant Regulatory Training/ Qualifications Relevant Pole Inspection and Treatment training
            3
      Key Tools and Equipment Required
   Traffic control devices
Maintained plant and equipment
Effective communication device for the area to be worked in
              4
    P.P.E Required
   Suitable P.P.E for the task of Pole Inspection First Aid kit
GPS Messenger (when no other forms of communication are possible)
    Version 3
As at 25th May 2020
 Uncontrolled when printed
 p1






























































   12   13   14   15   16