Page 14 - SWI Work Instruction
P. 14
Lendlease Services
PCT-TM-601A - Safe Work Instruction
Safe Work Instructions
Lone/ Isolated Working for Pole Inspection
PREPARED BY:
D Chesters,
REV No: REV date:
3 25/5/2020
Document Number
31
Scope:
The following instruction must be followed when working alone or isolated for the purpose of Pole Inspection
Action Instructions
Safety issues:
Always wear PPE and required safety gear.
Safety issues:
Ensure that suitable communications are in place when working alone.
Remember these important key points must be followed
1
Staffing Resources
Trained and competent personnel
2
Required Training and Certificates
Relevant Regulatory Training/ Qualifications Relevant Pole Inspection and Treatment training
3
Key Tools and Equipment Required
Traffic control devices
Maintained plant and equipment
Effective communication device for the area to be worked in
4
P.P.E Required
Suitable P.P.E for the task of Pole Inspection First Aid kit
GPS Messenger (when no other forms of communication are possible)
Version 3
As at 25th May 2020
Uncontrolled when printed
p1