Example 2
Consider an industrial site with two large buildings and a gate building. The gate should see all events to be able to
direct the fire brigade. Each building should have (as in the previous example) mutual monitoring and control
between the panels in the building, but there is no need to see the alarms between the buildings.

The configuration would be that all panels are visible to the gate panel, all panels in the first building are visible to
each other (but not to the panels in the second building) and, finally, all panels in the second building are visible to
each other (but not to the panels in the first building).












Building 2



5 6 7








Building 1


2 3 4





Gate

1





Site: Industrial site
Number of
Seeing panel Location Visible panels
connections
1 Gate 2, 3, 4, 5, 6, 7 6
2 Building 1 3, 4 2
3 Building 1 2, 4 2
© 2009 Schneider Electric. All rights reserved.
4 Building 1 2, 3 2
5 Building 2 6,7 2
6 Building 2 5,7 2
7 Building 2 5,6 2
Total number of connections 12