Planning Instruction 66571758GB0 Fire Detection 4




1.3 Regulations

EN54-14 “Guidelines for Planning, Installation, Commissioning and Maintenance” defines good general guidelines
for planning. Local specific regulations must also be followed.

The main planning and documentation phases are described in the diagram below. A typical lay out drawing
including devices is found in the section 1.4.


End user



Third party periodical inspection
Maintenance Maintenance







Use



Third party approval and/or handover




Installation Commissioning Commissioning and verification



Initialisation and configuration
Alteration,
modification or
Installation extension



Planning and design


Planning Assessment of needs or

Risk Assessment


Initial concept
© 2009 Schneider Electric. All rights reserved.



Standard EN54-14: Guidelines for planning