Page 2 - Zero Lot Line
P. 2

G                                          F                                          E                                           D                                          C                                          B                                          A
                                                                                                                                                                                                                                                                                 MO #2005001203           2018.05.22  2018.05.22  DATE








                            URBAN COEUR BRIDGER  KANSAS CITY, MO 64110  ARCHITECT OF RECORD:  DRAW ARCHITECTURE  + URBAN DESIGN LLC  214 W 21ST ST, SUITE 200  KANSAS CITY, MO 64108  STRUCTURAL ENGINEER:  LIA ENGINEERING  4808 LIBERTY STREET  KANSAS CITY, MO 64112  KAW VALLEY ENGINEERING  8040 N. OAK TRAFFICWAY  KANSAS CITY, MO 64118  ZERO LOT LINE - LOT 26  BEACON HILL OVERLOOK  © 2018 DRAW ARCHITECTURE AND URBAN DESIGN LLC ALL DRAWINGS AND WRITTEN INFORMATION APPEARING HEREIN  SHALL NOT BE DUPLICATED , DISCLOSED OR OTHERWISE USED  WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. ORIGINAL DRAWINGS SCALE TO 24" x 36" SHEET  UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED,  THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR  CONSTRUCTION, RECORDING PURPOSES, OR IMPLEMENTATION.  ISSUED FOR PERMIT ISSUED FOR PERMIT  GENERAL NOTES  G101  Printed 7/5/2018 4:37:33 PM










                         OWNER:  4325 TROOST AVE  T 816.457.1756  T 816.531.8303  F 816.531.8305  T 816.534.9542  CIVIL ENGINEER:  T 816.468.5858                                                              PRINCIPAL IN CHARGE  D DAVISON  PROJECT ARCHITECT  D DAVISON  PROJECT TEAM MEMBERS  D HERRON  J HARTMAN  DOMINIQUE DAVISON  RELEASE SCHEDULE  RELEASE  NO.
















                     1       ALL SUPPLY DUCTWORK AT UNCONDITIONED SPACES TO BE INSULATED WITH A  ALL PORTIONS OF FLOOR SUPPLY REGISTERS TO BE A MAXIMUM OF 9” FROM WALL.  ALL SUPPLY REGISTERS LOCATED IN HARDWOOD FLOOR TO RECEIVE FLUSH DUCT TOILET OR BATHROOM EXHAUST TO EXTERIOR PER CODE REQUIREMENTS. EXHAUST DUCT AT CLOTHES DRYER TO HAVE SMOOTH INSIDE WITH BACKDRAFT DAMPER.  VENT TO BE CONSTRUCTED WITH MIN. 0.016” RIGID METAL.  VENT SIZE ENSURE THAT EVERY ROOM (EXCEPT BATHS, KITCHENS, CLOSETS, PANTRIES, AND LAUNDRY ROOMS) HAS ADEQUATE RETURN AIR FLOW THROUGH THE USE OF INSTALL AIR FILTERS AND AIR HANDLERS MUST MAINTAIN ADEQUATE PRESSURE AND AIR FLOW.  AIR FILTER HOUSINGS MUST BE AIRTIGHT TO PREVENT BYPASS OR UPON INSTALLATION, SEAL ALL PERMANENT DUCTS AND VENTS TO MINIMIZE  PROVIDE ALL MATERIALS & LABOR REQUIRED TO COMPLETE PLUMBING WORK.  R‐13 WALLS, R‐49 ATTICS, R‐38 VAULTS, R‐19 FLOORS OVER UNCONDITIONED SPACES, CRAWL SPACE WALLS R‐10, BASEMENT WALLS‐ R‐13 CAVITY OR R‐10 CONTINOUS, SLABS SHALL BE R‐10 FOR A DEPTH OF 2 FOOT, AND A WINDOW U FACTOR OF .35 OR EGRESS WINDOWS SHALL COMPLY WITH SECTION 310 OF THE IRC. A COMPLIANT APPLICABL E. SEE DETAIL FOR EGRESS WELL. EGRESS WINDOW SIZE AND LOCATION WINDOWS, DOORS, AND OTHER GLAZING WILL COMPLY WITH THE REQUIREMENTS OF SEE WALL SECTION FOR FOUNDATION HEIGHT AND THE REINFORCEMENT GRADE, REQUIREMENTS OF INFORMATI















                                MINIMUM R‐5 INSULATION. MECHANICAL CONTRACTOR TO PROVIDE CONCRETE PAD FOR COMPRESSOR MOUNTED AT GRADE IF REQUIRED. MECHANICAL CONTRACTOR TO PROVIDE PROGRAMMABLE THERMOSTAT  (HONEYWELL OR EQUAL). WOOD FLOOR REGISTERS TO MATCH SPECIES OF HARDWOOD FLOOR.  TO MATCH DIAMETER OF THE APPLIANCE.  EXHAUST VENT LENGTH NOT TO EXCEED 25 FT AS CALCULATED PER CODE REQUIREMENTS.  MULTIPLE RETURNS, TRANSFER GRILLES, OR JUMP DUCTS.  CONTAMINATION DURING CONSTRUCTION.  REMOVE ANY SEALS AFTER ALL PHASES OF CONSTRUCTION COMPLETED.  ALL PLUMBING FIXTURES TO BE INSTALLED PER CODE.  RADON MITIGATION WILL FOLLOW A POSITIVE TEST RESULT. TESTING AND MITIGATION STANDARDS FOUND IN KCMO RADON POLICY. ENERGY CONSERVATION CODE. THE FOLLOWING VALUES ARE REQUIRED‐ BETTER. DUCTWORK NEEDS TO HAVE AN R‐8 VALUE. DENOTE ON THE PLANS OR  PROVIDE AN EQUIVALENT. EGRESS OUT OF THE BASEMENT AND HABITABLE ATTIC WILL BE PROVIDED IF  ARE NOTED ON THESE PLANS. WINDOWS WILL HAVE FALL PROTECTION PER IRC 312 .2 AS WHERE NEEDED. SECTION 308 OF THE IRC FOR SAFETY GLAZING. SPACING, AND POSITION FROM INSIDE FACE OF WALL, ALL FOLLOWING  THE MAXIMUM RISE PERMITTED FOR STAIRS IS 7.75”, AND THE MINIMUM RUN PERMITTED IS 10” MEASURED NOSE TO NOSE. THERE IS LIVING SPACE ABOVE THE GARAGE THE SHEETROCK SHALL BE 5/8”. RAFTER TIES, COLLAR TIES, AND STRUCTURAL RIDGES WILL BE INST ALLED PER








                     2                                                           LEAKAGE.       PLUMBING                                             GENERAL NOTES ‐ KCMO 2012 IRC                                      OTHERWISE.          BE PROVIDED.                                                                               2


                             6.    7.    8.   9.      10  .         11  .   12  .   13  .             1.  2.                                                   1     2               3          4  5    6             7    8     9       10    11           12      13    14    15  16  17  18  19     20   21    22         23



















                                   PROVIDED OF STUCCO PRIOR TO INSTALLATION.
                     3       STUCCO TO BE THREE‐COAT CEMENTITIOUS APPLICATION, SMOOTH FINISH, WITH COLOR AS SELECTED BY THE ARCHITECT AND OWNER. MOCK UP AREA 4'X4' TO BE INTERIOR FINISHES:  CONTRACTOR TO SUBMIT SAMPLES OF ALL INTERIOR MATERIALS TO BE APPROVED BY OWNER AND ARCHITECT PRIOR TO INSTALLATION INCLUDING, BUT NOT LIMITED TO:  BASE TRIM, CASING, NOSING PROFILES, CROWNS, CHAIR RAILS, HARDWOOD FLOORING FINISHES, INTERIOR DOOR PROFILES, SHELVING DETAILS, BEADED BASEBOARD, ETC.  ALL INTERIOR WOOD TO BE ON SITE FOR AT LEAST SEVEN (7) DAYS PRIOR TO INSTALLATION FOR TEMPERATURE AND HUMIDITY ACCLIMATION.  ALL SOFFITS TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL FIRE CODES TO SPECIFICALLY PROVIDE VERTICAL INTERIOR TRIM:   SUPPLY AND INSTALL ALL CASING FOR PAINT OR STAIN PER  CONTRACTOR TO INSTALL ALL BATH ACCESSORIES. ALL ITEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S PUBLISHED INSTRUCTIONS AND APPROVED INSTALLATION DRAWINGS. LOCATION PROVIDE FREEZE PROOF SPIGOT ON EXTERIOR LOCATIONS. SEE DURABILITY  CONTRACTOR TO FILL OUT ALL APPLIANCE WARRANTY CARDS AND INFORMATION FOR ALL APPLIANCES INCLUDING THOSE SUPPLIED BY OWNER.  ELECTRICAL: PROVIDE ALL MATERIAL AND LABOR TO COMPLETE PROJECT AS PER DRAWINGS AND AS REQUIRED. ALL CAN LIGHTS BELOW UNHEATED SPACES TO HAVE 'AIR‐LOC' GASKETS. ALL CAN LIGHTS INSTALLED IN INSULATED LOCATIONS TO









                                                          FIRE CONTAINMENT. DRAWINGS.  SEE DRAWINGS FOR MORE DETAILS.  SPECIALTIES  DETERMINED PER ARCHITECTURAL DRAWINGS.  STRATEGIES.  APPLIANCES  ELECTRICAL  THE INTERNATIONAL RESIDENTIAL CODE.  INSPECTIONS SHALL BE READILY ACCESSIBLE.  MANUFACTURER'S INSTRUCTIONS).  SERVICE IS REGULARLY FURNISHED.  WATERPROOF. PROVIDE SWITCH AT DISPOSAL AS REQUIRED.  SWITCH ARE INDICATED ON DRAWINGS.  FAN/LIGHT UNITS.  COORDINATE W/ OWNER.  MECHANICAL  FURNACE. PREVENT DAMAGE DUE TO TEMPERATURE CHANGES.  DEGREES BELOW ZERO FAHRENHEIT.  DUCTWORK CONSTRUCTION.









                             21  .    22  .                  23  .          1.         2.             1.            1.                           2.                      3.              4.  5.        6.      7.   FANS.  8.  9.  10  .   11  .  12  .  13  .  14  .  15  .    1.      2.                 3.   4.       5.



                     4                                                                                                                                                                                                                                                                                                                 4

















                                                      ASTM D‐2103 BELOW BASEMENT SLAB.                                                                   INCLUDING OWNER SUPPLIED.                         DOORS TO BE SEALED AND FINISHED.         STANDARDS SPECIFICATIONS.  RECEIVING CERAMIC TILE.  COAT, TWO FINISH COATS).






                     5       FIT INSULATION TIGHT WITHIN SPACES AND TIGHT TO AND BEHIND MECHANICAL AND ELECTRICAL SERVICES WITHIN THE PLANE AND INSULATION. LEAVE NO GAPS PROVIDE INSULATION AS REQUIRED  BY CURRENT BUILDING CODE. PROVIDE WATER‐RESISTIVE BARRIER AT EXTERIOR WALLS PER 2012 IRC 703.2 PROVIDE SEALANTS AND CAULKING MEETING APPLICABLE SPECIFICATIONS AS REQUIRED TO PROVIDE A POSITIVE BARRIER AGAINST MOISTURE AND PASSAGE OF PROVIDE 6‐MIL POLYETHYLENE VAPOR BARRIER MEMBRANE COMPLYING WITH PROVIDE NEW PREFINISHED GUTTERS AND DOWNSPOUTS PER DRAWINGS. INSULATE ALL WATER SUPPLY PIPING AS PER CODE. VENTILATION:  PROVIDE ALL MATERIALS NECESSARY FOR ADEQUATE ROOF VENTILATION INCLUDING, BUT NOT LIMITED TO, CONTINUOUS SOFFIT VENTS, SHINGLE‐OVER RIDGE VENTS WITH EXTERNAL BAFFLE, POWER VENTS, MUSHROOM CAPS AND/OR INSECT SCREENING AS PER DRAWINGS. FLASHING:  PROVIDE FLASHING AT ALL MATERIAL TRANSITIONS AND ALL EXTERIOR OPENINGS. PROVIDE HEAD, SIDE AND PAN FLASHING WITH SEALED END DAMS AND INTERIOR LIP AT ALL WINDOWS AND EXTERIOR DOORS.  EXTERIOR DOORS AND WINDOWS:  PROVIDE ALL LABOR AND MATERIAL REQUIRED FOR INSTALLATION OF WINDOWS AND EXTERIOR DOORS, WINDOW HARDWARE, EXTERIOR DOOR HARDWARE (MORTISE OR CYLINDER LOCK), AND SCREENS. INCLUDE ALL NECESSARY JAMB EXTENSIONS, SHIMS, AND HEAD SILL FLASHING AS REQUIRED AND PER DETAILS.  CAULK ALL SEAMS AS REQUIRED.  CONTRA




                                   OR VOIDS.     AIR.                                      DOORS AND WINDOWS                       CERTIFIED AND LABELED.         FINISHES                                      WHITE U.N.O.          AND SPECIFICATIONS.              CERAMIC TILE.                       CONSTRUCTION.       TO INSTALLATION.




                             6.       7.  8.  9.    10  .  11  .  12  .  13  .  14  .            1.                   2.              3.    4.              5.          1.                2.  3.      4.      5.   6.    7.         8.   9.            10  .   11  .  12  .  13  .  14  .  15  .  16  .  17  .  18  .  19  .  20  .







                                            ALL STEEL MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE




                     6             ALL STEEL SHALL BE FABRICATED, DETAILED AND ERECTED IN ACCORDANCE WITH AISC SPECIFICATIONS, LATEST EDITIONS, AND WITH THE AISC CODE OF STANDARD  VERIFY LENGTHS AND ELEVATIONS OF ALL LINTELS WITH THE ARCHITECTURAL  CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL MEANS NECESSARY TO INSURE THE STABILITY OF THE STEEL FRAME DURING CONSTRUCTION, UNTIL ALL ALL STEEL SHALL RECEIVE TWO SHOP COATS OF RUST INHIBITIVE GRAY PRIMER,  ROUGH FRAMING:  PROVIDE ALL NECESSARY MATERIAL FOR ROUGH FRAMING PROVIDE FRAMING AND ANCHOR BLOCKING FOR ALL MILLWORK, HANDRAILS, EQUIPMENT (FIREPROOF BLOCKING BY CODE), TOILET ACCESSORIES, SHELVING,  PROVIDE TRIPLE‐ GALVANIZED HANGERS FOR ALL PRESSURE TREATED LUMBER.  CARPENTRY CONTRACTOR WILL BE RESPONSIBLE FOR ALL REQUIRED RE‐FRAMING  WOOD POSTS MADE UP OF MULTIPLE STUDS TO BE CONSTRUCTED PER NATIONAL DESIGN SPECIFICATION 2012 EDITION.  CARRY ALL POSTS DOWN TO FOUNDATION DOUBLE FLOOR JOISTS UNDER ALL INTERIOR PARTITIONS RUNNING PARALLEL TO  EXPOSED SHELVING TO BE ¾” PLYWOOD WITH HARDWOOD EDGING OR VENEER BANDING.  ADJUSTABLE SHELVING TO BE SUPPORTED ON PINS SPACED AT 2” O.C.,  CHROME‐PLATED, 1 5/16” DIAMETER CLOSET ROD (ITEM #257273 OR #257265, NO MILLWORK TO INCLUDE ADDED FORMALDEHYDE OR MELAMINE MATERIAL.  INSTALL FLASHING AND SHEET METAL IN COMPLIANCE WITH “ARCHITECTURAL SHEET METAL MANUAL” BY SMACNA









                                              FOLLOWING ASTM SPECIFICATIONS: ‐ASTM A992/A572‐50 FOR ALL W‐SHAPES (BEAMS AND COLUMNS) ‐ASTM A500 FOR STRUCTURAL TUBING (TS);FY=46 KSI ‐PIPE SHAPES TO BE ASTM A53, GRADE B; FY=36 KSI ‐BOLTS AT BOLTED CONNECTIONS TO BE ASTM A325, ¾” DIA. U.N.O DRAWINGS. PROVIDE LINTELS FOR ALL OPENINGS FOR WHICH THEY ARE REQUIRED WHETHER OR NOT SHOWN ON DRAWINGS.  ADVISE ARCHITECT/OWNER OF THESE OPENINGS TO ALLOW FOR REVIEW OF LINTEL  FINAL CONNECTIONS HAVE BEEN MADE, AND THE FRAME BECOMES SELF  SUPPORTING AND STABLE.  EXCEPT AT SLIP CRITICAL CONNECTIONS.  INCLUDING WALL, FLOOR AND ROOF FRAMING, AND ALL WOLMANIZED MATERIALS (INCLUDING SILL PLATES) AS REQUIRED.  CABINETRY AND SHOWER BENCHES AS REQUIRED. INCLUDE ALL HARDWARE; INCLUDING SIMPSON JOIST HANGERS, SHEATHING CLIPS, BRACKETS, TIES, ANCHOR BOLTS, NAILS AND SCREWS AS REQUIRED. PROVIDE AN INSULATION STOP BETWEEN EACH ROOF RAFTER. ALL FRAMING TO BE LEVEL AND PLUMB. COORDINATE RECESSED CAN LIGHT AND AIR DUCT/VENT LOCATIONS WITH ELECTRICAL SUBCONTRACTOR AND ARCHITECT PRIOR TO FRAMING. IF THE BUILT FRAMING CONFLICTS WITH THE LAYOUT OF THE ELECTRICAL STRUCTURAL:  PROVIDE ALL STEEL, WOOD, AND MANUFACTURED LUMBER MEMBERS PER DRAWINGS.  PROVIDE TEMPORARY SHORING AS REQUIRED. CONTRACTOR TO SIZE AND PROVIDE ANY REQUIRED BEAM HANGERS AS PER ALL WOOD CONSTRUCTION TO COMPLY WITH “NATIONAL












                             METALS      PRACTICE.  ‐ASTM A36 U.N.O.       MEMBER SIZE.          CARPENTRY                                       EQUIPMENT.  DESIGN LOADS.                                       MILLWORK                                                           PLAIN FINISH.  MILL PHOSPHATED.
                     7                                                                                                                                                                                                            TYP.                                                                                                 7
                                   1.       2.                  3.            4.         5.            1.      2.       3.   4.  5.  6.  7.  8.     9.         10  .  11  .  12  .  13  .  14  .  15  .  16  .  17  .  1.    2.      3.    4.                 5.  6.         1.        2.       3.   4.              5.























                     8       GENERAL CONTRACTOR TO ENSURE THE JOB SITE SHALL BE SECURE AND SAFE AT ALL TIMES. THE ARCHITECT MAINTAINS NO RESPONSIBILITY FOR THE GENERAL CONTRACTOR OR SUBCONTRACTOR(S) (OR THOSE WORKING IN SUCH CAPACITIES), AND SHALL NOT BE RESPONSIBLE FOR SAFETY AND CONSTRUCTION PROCEDURES. THE ARCHITECT MAINTAINS NO RESPONSIBILITY FOR THE TECHNIQUES OR THE FAILURE OF THE CONTRACTOR TO CARRY OUT THE WORK IN ACCORDANCE WITH THE DRAWINGS OR THE REQUIRED CODES. PATCH, REPAIR OR REPLACE ANY EXISTING MATERIALS, FIXTURES OR SURFACES SCHEDULED TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION OR DEMOLITION ACTIVITIES. REPAIRS OR REPLACEMENTS MUST MATCH THE EXISTING MATERIAL IN TEXTURE, PROFILE, DIMENSION AND WHERE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEANING OF ALL INTERIOR SURFACES INCLUDING GLASS SURFACES, PRIOR TO OCCUPANCY OF THE SPACE BY THE OWNER. THE GENERAL CONTRACTOR, PRIOR TO OCCUPANCY, SHALL REMOVE ALL TRASH, CONSTRUCTION DEBRIS, MATERIALS, TOOLS, ETC. MATERIAL LIMITATION: IN RECOGNITION OF THE FACT THAT THE ARCHITECT HAS NO CONTROL OVER THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF CONSTRUCTION, ALL OF WHICH ARE SOLELY WITHIN THE CONTROL OF THE CONTRACTOR, THE OWNER AGREES THAT THE ARCHITECT SHALL NOT BE LIABLE FOR ANY PROPERTY DAMAGE OR PERSONAL INJURY TO ANY PERSON OR ENTITY RESULTING FROM ANY MATERIAL OR CIRCUMSTANCES EX





                                                          APPROPRIATE, SPECIES.                                                                OR DISPOSAL OF ASBESTOS.  STRICTLY PROHIBITED.                SITE WORK  SLOPES AWAY AT 5% MIN.).  APPROACH TO KEEP SOIL STABILIZED.  CONCRETE  AND PER DRAWINGS.  ACI 318 UNLESS NOTED OTHERWISE.  IMPAIR BOND.  DAMAGE.










                             27  .              28  .        29  .      30  .                              31  .                                  32  .                33  .                                       1.   2.                               1.                 2.           3.           4.    5.  6.   7.  8.






                     9                                                                                                                                                                                                                                                                                                                 9
























                     10            NOTES TO BE SUPPLEMENTAL TO PROJECT SPECIFICATIONS. GENERAL CONTRACTOR TO PREPARE SCHEDULE FOR WORK TO BE APPROVED BY OWNER PRIOR TO THE INITIATION OF WORK. GENERAL CONTRACTOR IS TO COORDINATE CONSTRUCTION ACTIVITIES WITH OWNER TO DISCERN DAYS IN WHICH NO WORK IS TO BE PERFORMED. HEREIN, THE GENERAL CONTRACTOR MAY BE REFERRED TO AS THE FOLLOWING: GENERAL CONTRACTOR, GC OR CONTRACTOR UNLESS OTHERWISE SPECIFIED. THE ARCHITECT MAY BE REFERRED TO AS: DRAW ARCHITECTURE, OR DRAW ARCHITECTURE + URBAN DESIGN. ALL CODES HAVING JURISDICTION SHALL BE OBSERVED STRICTLY IN THE CONSTRUCTION OF THE PROJECT, INCLUDING, BUT NOT LIMITED TO, ALL APPLICABLE STATE AND LOCAL COUNTY BUILDING, ZONING, ELECTRICAL, MECHANICAL, PLUMBING AND FIRE CODES. THE CONTRACTOR SHALL VERIFY ALL CODE REQUIREMENTS BEFORE COMMENCEMENT OF CONSTRUCTION AND BRING DISCREPANCIES IN THE DOCUMENTS TO THE ATTENTION OF THE ARCHITECT. A BUILDING PERMIT IS REQUIRED FOR THE PROJECT AND SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE OWNER WILL PAY FOR THE GENERAL BUILDING PERMIT. ALL OTHER PERMITS, LICENSES AND BONDS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR OR SUBCONTRACTOR(S). SUBCONTRACTORS ARE RESPONSIBLE FOR OBTAINING THEIR OWN RESPECTIVE GENERAL CONTRACTOR IS TO PAY FOR DUMPSTER PERMITS AS NECESSARY. ALL DEMOLITION DEBRIS SHALL BE TAKEN TO A LICENSED LANDF
                             GENERAL NOTES:                                              BUILDING PERMITS.  OR PUBLIC RIGHT‐OF‐WAY.  MUNICIPALITY.  THE OWNER.        APPROVALS.  OBSERVED.         ASH CAN.                                                              ARCHITECT.  OTHERWISE)   OF WORK.  THE NEW CONSTRUCTION.  STATUTES.







                                                            1.              2.              3.         4.         5.   6.       7.      8.   9.       10  .   11  .  12  .  13  .  14  .    15  .  16  .  17  .  18  .    19  .    20  .   21  .                     22  .   23  .    24  .           25  .   26  .



                                             G                                          F                                          E                                           D                                          C                                          B                                          A
   1   2   3   4   5   6   7