Page 15 - Simplified Wastewater Treatment Fundamentals / Operators Working With Maintenance
P. 15
Work Order and Job Site Preparation Example
Tom the Operator initiates daily wasting through the SCADA system.
Tom clicks to the WAS Pump screen and then clicks on WAS Pump 1 to begin
wasting.
WAS Pump 1 remains red (meaning OFF) and does not turn green (meaning ON).
Tom repeats the procedure to ensure he did it correctly.
When WAS Pump 1 again stays red when initiated, Tom goes to WAS Pump 2 and
clicks ON, seeing WAS Pump 2 go from red to green meaning the Pump turned
ON.