Work Order and Job Site Preparation Example cont.





                        Tom made a timely logbook entry regarding the WAS Pump 1 failure and proceeded to the


                        field and did the following:


                        1.     Tom first checked the WAS Pump 1 main breaker, seeing that the breaker was ON and

                               not tripped.


                        2.     Tom proceeded to WAS Pump 1 checking to ensure the local Pump OFF/ON switch was


                               turned ON


                        3.     Tom checked to ensure the WAS Pump 1 valving was correct.


                        4.     Tom contacted his Lead Operator and coordinated locking out WAS Pump 1.



                        5.     Once locked out, Tom attempted to turn WAS Pump 1 shaft.

                               (WAS Pump 1 is a centrifugal pump, so the shaft should turn easily but, in this case, did

                               not)


                        6.     Tom removed the pump inspection plate finding a ball of rags and removed them.



                        7.     Tom replaced the inspection plate, removed the system locks and tested the pump.