6. Safety Sytems

                    1.    Gas detectors : Update list of Gas detectors is not available. At present
                          based on OMS request and notification, the defective GDs are.

                    2.   DCS Alarms : All DCS alarms were kept in silent mode. To be kept on
                          line after attending unwanted  / defective alarms.

                    3.   Cleaning pigging of 42” crude line is not done since line commis-
                          sioned.

                    4.   Control room to be shifted to a safe place as per OISD recommenda-
                          tion.

                    5.   ISA, ESA,OISD audit  recommendations : Not liquidated completely.

                    6.   Mountable bullets header : LPG, Kothari, cetex sampling points are
                          covered with pipelines.

                    7.    Safety showers are not available near pump houses.


                    8.   Available safety showers at Fire training ground, OMS-III and ETPs are
                          not working.

                    9.   Telephones are not working.

                    10.   Hi, HiHi and SFH alarms are not there as per recommendations given in
                          OISD. Hi, HiHi and SFH alarms.

                    11.   SOPs for Tank changeover is not there and SOP is not available with
                          SIC of OMS.

                    12.  Tank Level Instruments calibration is not available.













               * Detailed observations were consolidated in the checklists with photographs.