a. All the water drain pits near the tanks shall be checked for leaks and reconstructed by RCC. Any blockage

 from the pit to sand trap pit / OWS shall be dechoked for free flow of water.


 Action: Maint- Civil  Target: 31st December -2021.



 b. All the roof drains outlet of crude tanks shall be routed to nearby OWS pit with a block valve closer to the

 OWS pit. Action:


 Maint- Off site (Field) / PE / Project- ES  Target: 31st December -2021.