a. All the water drain pits near the tanks shall be checked for leaks and reconstructed by RCC. Any blockage
from the pit to sand trap pit / OWS shall be dechoked for free flow of water.
Action: Maint- Civil Target: 31st December -2021.
b. All the roof drains outlet of crude tanks shall be routed to nearby OWS pit with a block valve closer to the
OWS pit. Action:
Maint- Off site (Field) / PE / Project- ES Target: 31st December -2021.