Page 41 - Presentation
P. 41
The roads and area around the
reclamation units are covered with
oil / Asphalt and stored with drums.
This operation is also not effective
in winter as heating of drums are
not possible (Melting by sun light
now). Suitable system for heating
the drum with steam coil has to be
explored and implemented.