Page 41 - Presentation
P. 41

The roads and area around the


                     reclamation units are covered with


                     oil / Asphalt and stored with drums.


                     This operation is also not effective


                     in winter as heating of drums are


                     not possible (Melting by sun light


                     now). Suitable system for heating


                     the drum with steam coil has to be


                     explored and implemented.
   36   37   38   39   40   41   42   43   44   45   46