Page 39 - Presentation
P. 39
Among all tankages, this area is in
very bad condition by more water
stagnation and asphalt spillage.
The following has to be carried out
to overcome the same.
a. Peripheral storm water canal
for asphalt tankage shall be
constructed at Road 9 North
side and asphalt tank farm east
side.
b. Devegetation / asphalt removal
inside the dyke.
c. Concreting of all asphalt tank
dykes with suitable slope
including dyke canal and
interconnection of the same
with peripheral canal.
d. Road canal has to be constructed
on both sides for the road at
north side of tank farm after
elevation of the road.