Page 51 - Annual Report 2016 - Cover & Divider Pages.indd
P. 51

In  need  of  a  renovated  space  to  accommodate  Prairie  Ridge  High  School’s  new  business
               incubator program - a robust learn-by-doing model of education in business – the school desired
               an environment where students participating in the program felt like they were in a real-world
               work setting with furnishings and technology that fit the part. The lab’s finishes are intended to
               create  an  upscale,  professional  environment.  Exposed  structure  and  sleek  LED  light  fixtures  in
               floating ceiling clouds add an urban, high-tech feel. The walls feature Deko marker board surfaces
               for team brainstorming. Formerly a computer lab no longer needed by the school, the footprint of
               the room was ideal to accommodate up to 30 students working in teams of five, including a 230
               sf break-out space for private team meetings or mentor phone calls and a 140 sf printing and
               storage area. The lab is on display through existing windows along the corridor—a planned feature
               used to advertise both the space and the business entrepreneurship program.
   46   47   48   49   50   51   52   53   54   55   56