                     Tahun 2025. Pembangunan SPAM Buaran III dilakukan melalui   The construction of SPAM Buaran III is carried out through
                     kerja sama skema Bundling. Hingga akhir Desember 2024,   Bundling scheme collaboration. At of the end of December
                     kemajuan konstruksi IPA Buaran III adalah sebesar 90,99%.  2024, the construction progress of IPA Buaran III was 90.99%.

                  4.  SPAM Pesanggrahan                            4.  SPAM Pesanggrahan
                     SPAM Pesanggrahan direncanakan akan menambah supply   SPAM Pesanggrahan is planned to increase supply by 750 liters
                     sebesar 750 lps. Pembangunan IPA Pesanggrahan dilakukan   per second. The construction of Pesanggrahan IPA is carried
                     oleh PAM JAYA. Di tahun 2024, kemajuan pembangunan SPAM   out by PAM JAYA. In 2024, the progress of SPAM Pesanggrahan
                     Pesanggrahan adalah sebesar 48,62%.              construction was 48.62%.

                  5.  SPAM Ciliwung                                5.  SPAM Ciliwung
                     Pembangunan SPAM Ciliwung direncanakan akan menambah   The construction of SPAM Ciliwung is planned to increase
                     supply sebesar 200 lps. Pembangunan IPA Ciliwung akan dilakukan   supply by 200 liters per second. The construction of Ciliwung
                     oleh PAM JAYA. Di tahun 2024, kemajuan SPAM Ciliwung sampai   IPA will be carried out by PAM JAYA. In 2024, the progress of
                     dengan akhir tahun 2024, yaitu telah dilakukan kick off project   SPAM Ciliwung until the end of 2024 included the kick off of the
                     IPA Ciliwung pada tanggal 25 November 2024 dengan progres   Ciliwung IPA project on November 25, 2024 with work progress
                     pekerjaan sampai dengan akhir 2024 adalah sebesar 0,36%.  until the end of 2024 being 0.36%.

                  6.  Reservoir Komunal (RK)                       6.  Communal Reservoir (RK)
                     PAM JAYA juga membangun Reservoir Komunal sebagai bentuk   As part of its innovation efforts in SPAM development, PAM JAYA
                     inovasi pengembangan SPAM. Reservoir Komunal merupakan   also constructs Communal Reservoirs that serve as infrastructure
                     infrastruktur untuk mengatur dan meningkatkan tekanan pada   to regulate and increase pressure in areas far from the IPA and
                     daerah terjauh dari IPA dan pompa booster yang areanya   booster pumps in low-pressure areas.
                     bertekanan rendah.
                     Manfaat pembangunan Reservoir Komunal di antaranya:  The benefits of building Communal Reservoirs include:
                     a.  ● Menjadi penampungan air sementara untuk area yang   a.  ● Acting as a temporary water storage for low-pressure areas;
                        bertekanan rendah;
                     b.  ● Menjaga optimalisasi supply di area bertekanan rendah;  b.  ● Ensuring optimal supply in low-pressure areas;
                     c.  ● Pelanggan yang tidak memiliki penampungan air tetap   c.  ● Customers who do not have water reservoirs still get supply
                        mendapatkan supply dari Reservoir Komunal;       from the Communal Reservoir;
                     d.  ● Berdampak kepada peningkatan supply pelanggan existing   d.  ● Contributing to increased supply for existing customers
                        dan untuk pelayanan potential new customers;     and potential new customers;
                     e.  ● Membantu menjaga konservasi lingkungan.    e.  ● Supporting environmental conservation efforts.


                     Sampai dengan akhir Tahun 2024, PAM JAYA telah membangun 7   By the end of 2024, PAM JAYA constructed 7 communal
                     reservoir komunal, yaitu Reservoir Komunal Duri Kosambi, Tamansari,   reservoirs, namely RK Duri Kosambi, Tamansari, Pluit Reservoir,
                     Waduk Pluit, Cilincing, Marunda, Gandaria Utara, Tambora.  Cilincing, Marunda, Gandaria Utara, and Tambora.

                  7.  Penurunan Non-Revenue Water (NRW)            7.  Decreasing Non-Revenue Water (NRW)
                     PAM JAYA telah melakukan Studi Pendahuluan NRW di wilayah   PAM JAYA has conducted a Preliminary Study of NRW in the
                     DKI Jakarta yang bertujuan untuk pemetaan kondisi NRW dan   DKI Jakarta area aimed at mapping the NRW conditions and
                     penyusunan roadmap NRW untuk mencapai target NRW 30%   developing an NRW roadmap to achieve a 30% NRW target
                     di tahun 2030.                                   by 2030.
                     Di tahap awal, PAM JAYA melakukan program penurunan NRW   In the initial stage, PAM JAYA initiated NRW reduction programs in
                     pada 6 (enam) DMA Pilot Project yang tersebar di area Barat   6 (six) DMA Pilot Projects spread across the Western and Eastern
                     dan Timur wilayah pelayanan. DMA Pilot Project tersebut di   service areas. These DMA Pilot Projects are located in:
                     antaranya berada di area:
                     a.  ● 15802 Kampung Melayu (Wilayah Timur)       a.  ● 15802 Kampung Melayu (East Area)
                     b.  ● 14704 Duren Sawit (Wilayah Timur)          b.  ● 14704 Duren Sawit (East Area)
                     c.  ● 04902 Pulomas (Wilayah Timur)              c.  ● 04902 Pulomas (East Area)
                     d.  ● S012 Asem Baris (Wilayah Barat)            d.  ● S012 Asem Baris (West Area)
                     e.  ● B004 Kebon Jeruk (Wilayah Barat)           e.  ● B004 Kebon Jeruk (West Area)
                     f.  ● B014 Abdul Wahab (Wilayah Barat)           f.  ● B014 Abdul Wahab (West Area)








                  LAPORAN TAHUNAN 2024                          49                                 Annual Report 2024