Page 8 - Luke AFB Thunderbolt, August 2021
P. 8

8      Thunderbolt                                                                                                                    Photo Feature                                                                                                                                              August 2021  9
            www.aerotechnews.com/lukeafb
                                                                                                                                                     http://www.luke.af.mil                                                                                                            Facebook.com/LukeThunderbolt





















                                                                                                           Photos by Tech. Sgt. Franklin R. Ramos, 56th Fighter Wing Public Affairs























                                                                                                                                                                                                                  Airmen assigned to the 56th Civil Engineer Squadron prepare to move a heating, ventilation, and air conditioning
                                                                                                                                                                                                                  chiller into the base fitness center, June 14, at Luke Air Force Base. By executing the construction as an in-house
                                                                                                                                                                                                                  troop-training project, the 56th CES will save the Air Force an estimated $1.2 million, making it the largest active
                                                                                                                                                                                                                  project of its kind in the Air Education and Training Command. In-house training projects enable the squadron to
                                                                                                                                                                                                                  provide valuable training and real-world construction experience for Airmen, while simultaneously completing
                                                                                                                                                                                                                  infrastructure upgrades that will enable the 56th Fighter Wing to meet its warfighting needs.





                                                                                                           LEFT: Airmen assigned to the 56th Civil Engineer Squadron, guide a heating, ventilation, and air conditioning chiller
                                                                                                           toward the base fitness center, June 14, at Luke Air Force Base.






       Airmen assigned to the 56th Civil Engineer Squadron level a heating, ventilation, and air conditioning chiller be-
       fore moving it into the base fitness center, June 14, at Luke Air Force Base. By executing the construction as an
       in-house troop-training project, the 56th CES will save the Air Force an estimated $1.2 million, making it the larg-
       est active project of its kind in the Air Education and Training Command. The HVAC system upgrade coincides
       with the 56th Fighter Wing’s effort to bolster partnerships and infrastructure by providing units with sufficient
       resources, tools, equipment and facilities such as the fitness center.

























                                                        Senior Airman Bradley Tucker, 56th Civil Engineer
                                                        Squadron electrical systems journeyman, connects a                                                                                                                                                           Hernandez seals an underground water pipe at the base
                                                        wire to a heating, ventilation, and air conditioning com-                                                                                                                                                    fitness center, June 2, at Luke Air Force Base.
                                                        ponent at the base fitness center, June 22, at Luke Air
     Airman Manolo Alvarado Hernandez, 56th Civil Engineer   Force Base. The 56th CES provides technically sound                                                                                                                                                     LEFT: Airmen assigned to the 56th Civil Engineer Squad-
     Squadron water and fuels system maintenance appren-  combat engineers to build, sustain, and protect Luke                                                                                                                                                       ron pull wiring through a heating, ventilation, and air
     tice, tightens a cap on an underground water pipe at the   AFB’s $2 billion in infrastructure and $4.8 billion of air-  A wheel loader assigned to the 56th Civil Engineer Squadron pushes a heating, ventilation, and air conditioning chill-                  conditioning component at the base fitness center, June
     base fitness center, June 2, at Luke Air Force Base.   craft, through engineering.                    er into the base fitness center, June 14, at Luke Air Force Base.                                                                                         22, at Luke Air Force Base.
   3   4   5   6   7   8   9   10   11   12   13