      MOCK DRILL AT FGD RIHAND PROJECT


       Emergency for which mock-drill is conduct: Fall of person from height
       Type of mock-drill: Practice Drill
        Overall response time: 30 mnts

          Sr. No.              Good points of mock drill                     Observed shortfall in mock drill

                     Workers (M/S KUNAL) called to site supervisor &   Ambulance Driver & First Aider are not available
             01
                            EHS person called to Ambulance.            on vehicle. First aider had gone outside the plant
                                                                          gate for petrol at the time of emergency.
                   Supervisor called to Bolero (M/S KUNAL) due to non        Ambulance did not reach timely at
             02     -availability of Ambulance. Supervisor and workers              emergency location.
                     manually shifted the victim safely to the Bolero.



                       Corrective actions initiated related to observed
           Sr. No.                                                         Responsibility            Target
                         shortfall in mock drill, Area of improvement

                     Notified to Ambulance Driver and First aider      Jaiprakash Gupta &     Immediate after
              01     regarding always be available to Ambulance &
                     Emergency. Notified to Ambulance driver and first   Respective contractor mock drill
                     aider check the condition of Ambulance & fuel     EHS
                     level (petrol) on regular basis.