Page 16 - Preparing For Our Future Brochure
P. 16

Frequently Asked Questions

       These are the                        Why a Master Facility Plan?       Why Now?                                •	Extensive renovations of
       frequently asked                                                                                                 the Middle School will cost
       questions from                       Think of our school facilities    •	Interest rates are relatively low,    our community more in the
       community focus                      in thirds: high school, middle      which significantly impacts the         long run.
       group meetings, the                  school, and early elementary        overall cost.
       meetings with Hudson                 buildings. Previous school and                                            Why does Ellsworth Hill
       Heritage Association,                community leadership addressed    •	A facility plan will take years to   Elementary need an addition?
       the community                        the replacement of the high         implement.
       engagement                           school, the middle school, and                                            As the current PreK and 2nd
       meetings, the Central                elementary school facilities in   Why do we need a new Middle             grade building, Ellsworth Hill was
       Campus neighbors                     approximately 30 year cycles.     School? Why not just renovate?          designed to accommodate an
       meeting, and by                      It is important that we continue                                          addition to serve more students
       individual community                 to plan ahead so that the high    •	After extensive research,            and take advantage of an
       members at various                   school, middle school, and          professional input, and               excellent facility.
                                            elementary school facilities do     community engagement,
    facpirleitseynptlaatinonnisn.g process  not need to be replaced at the      it has been concluded that            How will Evamere be used
                                            same time.                          the construction of a new             in the future?
                                                                                middle school is the most
                                                                                responsible long-term option          After all construction is
                                                                                for our community.

    facility planning process

    community           innovation             facility             facility study         alpha report          visioning              master plan
    surveys             think tank             committee            task force                                   workshop               development
                                                                                           In 2015, Alpha
    Through various     In 2011, the District  In 2012, a standing  In 2013, a task force  Facility Solutions    In 2015, the District  In 2016, the District
    survey events our   brought together       facility committee   was assembled to       converted our         conducted an           synthesized
    constituents have   a diverse group        was created to       study, evaluate, and   static facility data  Educational and        the collective
    communicated to us  to brainstorm key      help prioritize      recommend how          into a dynamic        Facility Visioning     information gained
    that adequate and   issues including       the allocation of    the District can       capital forecasting   Workshop that          from all prior efforts
    updated facilities  operational            resources and        best use existing      system called         concluded with a       to develop the
    are important.      efficiencies. Key      educate a broader    facilities to enhance  CapitalForecast       formal report in       Master Facility Plan.
                        themes surfaced        group on facility    the educational        Direct, a School      2016. The results
                        regarding grade        life cycle planning  experience and         Dude cloud-based      showed a desire to
                        level alignment and    and facility         achieve greater        product. Alpha        integrate flexible
                        administrative office  maintenance.         operational            Solutions produced    spaces that support
                        consolidations.                             efficiencies.          a comprehensive       student-centered
                                                                                           report that we refer  learning.
                                                                                           to as the Alpha
                                                                                           Report.

16
   11   12   13   14   15   16   17   18   19   20